In fullfilmen the needs of raw materials partially, the buyer determines the amount of raw material ordered and the supplier send the appropriate amount of raw materials are ordered. These relationships often lead to a mismatch of needs raw materials by the number of available raw materials suppliers in the inventory purchases that result in higher costs of raw materials and the total cost of inventory. Therefore there is need for a policy that can control the system in an integrated supply of raw materials. The study begins with the determination of lot size by the buyer. Furthermore, the determination of lot size is determined by the supplier with approaches vendor-managed inventory (VMI). In this case the supplier to supervise the inventory status of the buyer, so buyers do not need to make the ordering process. At VMI with consignment approach (VMI-C) the buyer is not burdened with the cost savings, due to the transfer of ownership of raw materials occurs when raw materials used in the production floor. Based on calculations with observational data obtained on an approach that VMI and VMI-C total cost of inventory buyers and suppliers can deliver better results than not applying both approaches.
Published by | Universitas Trisakti |
Journal Name | TEKNIK INDUSTRI |
Contact Phone | - |
Contact Name | - |
Contact Email | - |
Location | Kota adm. jakarta barat, Dki jakarta INDONESIA |
Website | tekin| http://www.trijurnal.lemlit.trisakti.ac.id/index.php/tekin| |
ISSN | ISSN : -, EISSN : -, DOI : -, |
Core Subject | Engineering, |
Meta Subject | Industrial & Manufacturing Engineering, |
Meta Desc | Jurnal Teknik Industri diterbitkan sejak bulan Oktober 2000 oleh Jurusan Teknik Industri, Fakultas Teknologi Industri, Universitas Trisakti. Terbit tiga kali dalam setahun yaitu Maret, Juli dan Nopember. Redaksi menerima karangan ilmiah berupa hasil penelitian, survey dan telaah pustaka yang erat kaitannya dengan Bidang Teknik Industri. |
Penulis | Saraswati, Docki , Maulidya, Rahmi , Kurniasari, Mira |
Publisher Article | Jurusan Teknik Industri, Fakultas Teknologi Indusri Universitas Trisakti |
Subtitle Article | JURNAL TEKNIK INDUSTRI Vol 1, No 1 (2011): Volume 1 No 1 Maret 2011 |
Scholar Google | http://scholar.google.com/scholar?q=%2Bintitle%3A&… |
View Article | http://www.trijurnal.lemlit.tr… |
DOI | https://doi.org/10.25105/jti.v1i1.6… |
DOI Number | DOI: 10.25105/jti.v1i1.6992 |
Download Article [1] | http://www.trijurnal.lemlit.trisakti.ac.… |
Download Article [2] |
Informasi yang terkait dengan Penentuan Ukuran Lot Gabungan Untuk Pembeli Tunggal Dan Pemasok Tunggal Mempergunakan Pendekatan Vendor Managed Inventory Consignment (VMI C)
Sistem penentuan kelamin XY Sistem penentuan kelamin Sistem penentuan kelamin ZW Teori Penentuan Agenda Penentuan Pendapat Rakyat Penentuan tempat ketiga Penentuan permukaan tersembunyi Penentuan Agenda Terbalik Terapi penentuan ulang seks Haplodiploid Penentuan laju cahaya oleh Rømer Penentu Tahap penentu laju Ketentuan asal barang Play-off Grup Dunia Piala Davis 2011 Perjanjian tentang Ketentuan Asal Barang Referendum penentuan nasib sendiri Kepulauan Ellice Ketentuan moral kepanduan Kontroversi penentu alam Determinan sosial kesehatan Babak kualifikasi Liga Champions UEFA 2017–2018 Hak m…
enentukan nasib sendiri Babak kualifikasi Liga Champions UEFA 2018–2019 Penanggalan radiokarbon Babak kualifikasi Liga Champions UEFA 2016–2017 Kamen Rider Build Transformation Lessons, The Laws Of Transformation Are Set! Pemisahan kekuasaan