Metro line in Suzhou, Jiangsu, China
Line 11 A train of Suzhou Rail Transit Line 11
Status In operation Owner Suzhou Rail Transit Co., Ltd Termini Stations 28[ 1] Type Rapid transit System Suzhou Rail Transit Operator(s) Suzhou Rail Transit Co., Ltd Rolling stock 6-car Class B[ 2] Opened 24 June 2023; 19 months ago (2023-06-24 ) [ 3] Line length 41.27 km (25.64 mi) Number of tracks 2 Character Underground[ 4] [ 5] Track gauge 1,435 mm (4 ft 8+ 1 ⁄2 in )Electrification overhead wire Operating speed 100 km/h (maximum)
Line 11 [ 6] is a rapid transit line of the Suzhou Rail Transit system. It was formerly known as Line S1 during planning and construction. Construction started on November 27, 2018. It opened on 24 June 2023.[ 3] [ 7] [ 8] The line uses driverless 6-car Class B rolling stock operating up to 100 km/h (62 mph).[ 9] [ 10] Partial through-running on Line 3 began on December 23, 2023, and full through-running began on June 29, 2024.
Description
Running west-east, the line mainly serves the urban area of Kunshan , and connects it to Suzhou Industrial Park in the west and nearby Shanghai in the east via a transfer at Huaqiao station to Line 11 of Shanghai Metro .[ 1] The line is the first metro line in downtown Kunshan .[ 4]
Stations
Service routes
Local service (L): Suzhou Xinqu Railway Station (Line 3) — Huaqiao
Rapid Service (R): Gongqing — Huaqiao, eastern bound in the morning, and western bound in the night
Through service
Through service between Line 3 and Line 11 started on December 23, 2023.[ 13]
Rolling stock
Fleet numbers
Year Built
Time in service
Builder
Class
Number in service
No of car
Assembly
Rolling stock
Number
Depots
Line assigned
Notes
210 (35 sets)
2022-2023
2023-present
CRRC Nanjing Puzhen
B
210 (35 sets)
6
Tc+Mp+M - M + Mp+Tc
PM187
110101-113506 (1101-1135)
Xushuguan Depot South Weiting Yard Chaoyang Road Depot Huaqiao Yard
3 11
References
Line 11 Stations that are proposed, under planning or under construction are shown in italics .
Public transportation in Jiangsu (JS)
Nanjing Metro
Lines in operation Under construction
3 (Phase 3)
4 (Phase 2)
5 (North section)
6
9
10 (Phase 2)
11
S2
S4 (Nanjing section)
S5
Under planning
2 (eastern extension)
3 (Phase 4)
4 (Phase 3)
8
9 (Phase 2)
10 (Phase 3)
16
18
S3 (eastern extension)
S6 (western extension)
Suzhou RT
Lines in operation Under construction
2 (northern extension)
4 (northern extension)
7 (northern extension)
10 (S5)
Under planning
Wuxi Metro
Lines in operation Under construction
S2
4 (Phase 2)
5 (Phase 1)
6 (Phase 1)
Under planning
2 anzhen
5 (Phase 2)
6 (Phase 2)
3 (North extension)
3 (South extension)
3 Branch line
4 (Phase 3)
7
8
Changzhou Metro
Lines in operation Under construction Under planning
Xuzhou Metro
Lines in operation Under construction Under planning
Nantong RT
Shanghai Metro (Jiangsu Section)
Shanghai Suburban Railway (Jiangsu Section)
LRT & trams
Transportation hubs
Int'l airports Railway stations