Line 7 of Nanjing Metro is a northeast–southwest line running roughly parallel to the south bank of the Yangtze River. The line began operation on 28 December 2022.[1] This line is also the first metro line to use GoA4 automated trains in Nanjing.[2]
History
Construction of Line 7 began on 29 November 2017.[3]
The north section from Xianxinlu to Mufuxilu opened on 28 December 2022,[1] the sorth section from Yingtiandajie to Xishanqiao opened on 28 December 2023,[4] and the central section from Mufuxilu to Yingtiandajie opened on 28 December 2024.[5]
To allow construction of middle section, both north and south section of line 7 suspended operation during 10 July and 18 August 2024.[6]