Line 7 of Suzhou Rail Transit is north-south rapid transit line in Suzhou. Construction started on December 25, 2019. Changlou - Hongzhuang section starts operation on December 1, 2024, but the operation of Moyang - Changlou section is postponed due to the construction of Suzhou North railway station.
According to the plans, the part of Line 4 between Hongzhuang and Muli stations is operated as part of Line 7.[1] The combined line will be 40.6 km long. In addition, a 4-station, 7.11 km northern extension from Moyang to Chunqiu Road started construction in May 2022, for an opening in 2026.
It has Tian'edang Yard (Chinese: 天鹅荡停车场) in use.[2]
Opening timeline
Segment
Commencement
Length
Station(s)
Name
Hongzhuang — Muli
15 April 2017
11.1 km (6.90 mi)
7
Phase 1 south section (taken over from line 4 branch)
^"苏州轨道交通". Archived from the original on 2012-07-13. Retrieved 2012-06-29. (Website of the subway operator "SZ-Transit" (苏州轨道交通/Suzhou Guidao Jiaotong) (information retrieved on Oct. 16th, 2010))[dead link]
^顾蕾 (2012-02-10). 苏州轨交4号线及支线今年6月动工. 苏州日报 (in Chinese). Archived from the original on 2012-07-14. Retrieved 2012-06-19.