Zapote station
Zapote station is a proposed Light Rail Transit (LRT) station located on the LRT Line 1 (LRT-1) system in Bacoor, Cavite. It will be situated at the line's Zapote Satellite Depot. It differs from other LRT-1 stations in that it will be constructed at grade. It is part of the LRT-1 South Extension Project. It would be the first LRT-1 station outside Metro Manila. HistoryZapote station was first planned as part of the Line 1 South Extension plan, which calls for a mostly elevated extension of approximately 11.7 kilometers (7.3 mi). The extension will have 8 passenger stations with an option for 2 future stations (Manuyo Uno and Talaba).[1] The project was first approved on August 25, 2000 and the implementing agreement for the project was approved on January 22, 2002.[2] However, construction for the extension was repeatedly delayed until the project was shelved years later. The plans for the southern extension project were restarted as early as 2012 during the Benigno Aquino III administration and was expected to begin construction in 2014, but was delayed due to right of way issues. The issues were resolved in 2016 and the project broke ground on May 4, 2017.[3] Meanwhile, construction works on the south extension began on May 7, 2019 after the right of way acquisitions were cleared.[2] On November 15, 2024, Phase 1 of the LRT Line 1 Extension, which runs between Redemptorist and Dr. Santos, was inaugurated; the LRMC management announced the start of its commercial operations to be on the following day.[4][5] Meanwhile, Phases 2 and 3 will begin operations by 2031 as challenges hindered their completion with the delays in the acquisition of right of way.[6] See alsoExternal links
References
|