Bankside at Colliers Yard
Bankside at Colliers Yard is a residential skyscraper under construction in the Greengate area of Salford, Greater Manchester, England. The building is part of developer Renaker's Greengate masterplan called Colliers Yard,[1] which consists of three adjacent towers, the others being Cortland which topped out in July 2022, and Parkside which was granted planning permission in March 2023.[2] When completed, at 43 storeys[3] and 129 metres (423 ft), it will be the third-tallest building in Salford and the 12th-tallest building in Greater Manchester. It was designed by Denton Corker Marshall.[4] HistoryPlanningA hybrid planning application, which included the tower ultimately named Bankside at Colliers Yard, was submitted to Salford City Council in 2019,[5] with reserved matters consent obtained in March 2022.[6][7] ConstructionConstruction of Bankside at Colliers Yard commenced in March 2022[4] and is expected to complete in 2025.[citation needed] The tower will contain 444 apartments.[4] See also
References
|