X1 Media City

X1 Media City
Map
General information
StatusTowers 1 and 2: complete
Tower 3: near complete
Tower 4: proposed[1]
TypeResidential high-rises
LocationSalford Quays,
Greater Manchester,
England, United Kingdom
AddressMichigan Avenue
Coordinates53°28′27″N 2°17′29″W / 53.47426°N 2.29125°W / 53.47426; -2.29125
Construction startedTower 1: 2015
Tower 2: 2017
Tower 3: 2019
CompletedTower 1: 2017
Tower 2: 2019
Cost£200 million[2]
OwnerX1 Developments
Knight Knox
HeightTower 1: 85 m (277 ft)
Tower 2: 85 m (277 ft)
Tower 3: 85 m (277 ft)
Technical details
Floor countTower 1: 26
Tower 2: 26
Tower 3: 26
Design and construction
Architect(s)AHR
Falconer Chester Hall
Main contractorVermont Construction
Website
Developer website

X1 Media City is a residential development in Salford Quays, Greater Manchester, England. When fully built, the scheme will comprise four identical 85 m (277 ft) tall, 26-storey high-rise towers, each containing 275 apartments (1,100 in total).[3] Towers 1 and 2 have been constructed, completing in 2017 and 2019 respectively.[4][5] As of June 2023, Tower 3 was nearing completion[6][needs update] and Tower 4 is yet to start.

The towers were originally designed by architects AHR,[7] with Falconer Chester Hall being brought on as designers following planning consent.[8][9] As of 2025, Towers 1 and 2 are the joint 10th-tallest buildings in Salford.

History

Planning

The original planning application for four 26-storey buildings comprising 1,036 apartments was submitted to Salford City Council in October 2006,[10] with a further application submitted in April 2010 to extend the time to implement the original planning permission.[11] In May 2015, an amendment application was submitted to increase the number of apartments to 1,100.[12] Planning approval was obtained in September 2015.[13]

Construction

The construction of Tower 1 commenced in 2015[14] and was completed in 2017.[4] Tower 2 started construction in 2017[15] and was completed in 2019.[5] The construction of Tower 3 began in 2019,[16] and in February 2023 the floors up to level 13 were fully complete, with works ongoing up to level 26.[17]

Facilities

X1 Media City Tower A is a 26-storey development offering properties ranging from studios to 3-bedroom apartments.[18] Towers A and B both include an on-site cinema, private gym and underground parking, as well as retail units on the ground and first floors.[19]

Harbour City tram stop on the Eccles Line of the Metrolink system is located directly outside X1 Media City.[4]

See also

References

  1. ^ "X1 Media City". Skyscraper Center. Retrieved 6 March 2023.
  2. ^ "Work Begins On New £200m X1 Media City Project". Confidentials Manchester. 2 April 2015. Retrieved 6 March 2023.
  3. ^ Smithers, Dominic (24 March 2016). "Knight Knox Media City scheme sells out". Manchester Evening News. Retrieved 6 March 2023.
  4. ^ a b c "First tower completes at X1 Media City". Place North West. 7 December 2017. Retrieved 6 March 2023.
  5. ^ a b "Work Completes on Second X1 Media City Tower". Insider Media. 25 July 2019. Retrieved 6 March 2023.
  6. ^ "Construction Update – Media City Tower 3 – June 2023". Vermont. 6 June 2023. Retrieved 22 July 2024.
  7. ^ "X1 Media City resi on site". Place North West. 1 April 2015. Retrieved 6 March 2023.
  8. ^ Jackson, Nick (17 March 2017). "Topping out takes place at £200m X1 Media City". The Business Desk. Retrieved 17 January 2025.
  9. ^ "Michigan Avenue, Manchester". Falconer Chester Hall. Retrieved 17 January 2025.
  10. ^ "Planning Application 06/53636/FUL". Salford City Council. Retrieved 17 January 2025.
  11. ^ "Planning Application 10/58887/FUL". Salford City Council. Retrieved 17 January 2025.
  12. ^ "Planning Application 15/66481/FUL". Salford City Council. Retrieved 17 January 2025.
  13. ^ "Green Light for X1 Media City Expansion". Insider Media. 4 September 2015. Retrieved 6 March 2023.
  14. ^ "X1 Media City Tower 1". Skyscraper Center. Retrieved 6 March 2023.
  15. ^ "Construction Update – Media City – August 2017". Vermont. 3 August 2017. Retrieved 6 March 2023.
  16. ^ "Construction Update – Media City Tower 3 – November 2019". Vermont. 3 December 2019. Retrieved 6 March 2023.
  17. ^ "Construction Update – Media City T3 – February 2023". Vermont. 2 February 2023. Retrieved 6 March 2023.
  18. ^ "X1 Media City Tower A". X1 Sales & Lettings. Retrieved 25 July 2024.
  19. ^ "X1 Media City Tower B". X1 Sales & Lettings. Retrieved 25 July 2024.

 

Prefix: a b c d e f g h i j k l m n o p q r s t u v w x y z 0 1 2 3 4 5 6 7 8 9

Portal di Ensiklopedia Dunia