The factories and main offices of SCUL are located off of the Tororo–Mbale Road, in Nyakesi Village, Nyakesi Parish, Rubongi sub-county, in Tororo District, approximately 9 kilometres (6 mi), by road north of the central business district of the town of Tororo.[6] The coordinates of the Simba Cement Uganda Limited Complex are: 0°44'05.0"N, 34°11'02.0"E (Latitude:0.734709; Longitude:34.183878).[7]
Overview
The new cement factory has an installed production capacity of one million metric tonnes annually. It was developed at an estimated cost of US$185 million. Other credible sources have estimated cost at US$199 million.[3] Commercial production started during the first half of 2018.[8] Installed capacity production is 3,000 metric tonnes daily, which translates to about 800,000 metric tonnes annually.[9]
Ownership
SCUL is a wholly owned subsidiary of National Cement Company Limited (NCCL) based in Kenya.[3][10] The shareholding in National Cement Kenya, the parent of Simba Cement Uganda Limited, is as illustrated in the table below:[11]
The main contractor was Mepani Technical Services Limited. The construction of the factory (excluding equipment and systems), cost an estimated US$55 million, and took two and one half years. Official commissioning took place on 29 August 2018.[1]