Ruzizi II Hydroelectric Power Station
Ruzizi II Hydroelectric Power Station (French: Centrale Hydroélectrique Ruzizi II) is a 44 megawatts (59,000 hp) hydroelectric power station on the Rusizi River between Rwanda and the Democratic Republic of the Congo LocationThe Ruzizi II Hydroelectric Power Plant is on the Rusizi River between Rwanda and the DRC.[1] It is 16 kilometres (9.9 mi) downstream from the Lake Kivu overflow at the head of the Rusizi River. It is in a V-shaped valley running through a mountainous region that is 1,460 metres (4,790 ft) above sea level at Bukavu, at the head of the river. The catchment area includes a mix of urban, suburban and rural land use.[2] ConstructionThe Ruzizi II Hydroelectric Power Plant was built between 1983 and 1989.[3] Construction was funded through development credit agreements between the member countries and the International Development Association, under which each country assigned the funding received to International Electricity Company of the Great Lakes Countries (SINELAC), which would undertake the project.[4] DamThe power plant is fed by the Ruzizi II Gravity Dam, 14 metres (46 ft) high and 85 metres (279 ft) long.[5] The reservoir is polluted by urban wastewater. Fish ladders were installed during dam construction for migrating fish such as cyprinids. However, the dam operators have not maintained water flows in the ladders.[2] PlantThe power plant has three Francis Turbines.[5] It delivers a maximum of 44 MW, and has potential annual production of 200 GWH.[3] Between 1991 and 2001 it provided, on average, 45% of Rwanda's electricity, 17% of Burundi's electricity and 21% of the DRC's electricity.[6] The plant has suffered from technical problems and poor management. As of 2015 the average output was 25 MW.[2] See alsoReferencesSources
|
Portal di Ensiklopedia Dunia