Ningde Nuclear Power Plant

Ningde Nuclear Power Plant
Map
Official name宁德核电站
CountryPeople's Republic of China
LocationFuding, Ningde, Fujian
Coordinates27°2′40″N 120°17′0″E / 27.04444°N 120.28333°E / 27.04444; 120.28333
StatusOperational
Construction began2008
Commission dateDecember 2012
Construction costUS$7.6 billion (units 1–4)
OwnerNingde Nuclear Power Co Ltd (NDNP)
Nuclear power station
Reactor typeCPR-1000, HPR-1000 PWRs
Power generation
Units operational4 × 1018 MW
Units planned1 × 1200 MW
Units under const.1 × 1200 MW
Nameplate capacity4072 MW

Ningde Nuclear Power Plant (simplified Chinese: 宁德核电站; traditional Chinese: 寧德核電站; pinyin: Níngdé hé diàn zhàn) is a nuclear power plant in Fujian province, China. The site is located in Beiwan village in the town of Qinyu, Fuding, Ningde, Fujian.[1] The plant will ultimately have six gigawatt-scale pressurized water reactors (PWRs).[2] The first reactor began operation on 18 April 2013.[3]The Ningde Nuclear Power project was approved by the National Development and Reform Commission (NDRC) in 2007.[4] The project is 51% funded by the Guangdong Nuclear Investment Company Ltd, with Datang International Power Generation Co and the Fujian Coal Group completing the shareholding. A total investment of 52 billion yuan (US$7.6 billion) should result in the completion of Ningde Phase I.[5] Including the final two units of Phase II, the total cost will exceed 70 billion yuan.[4] The four units of Phase I will generate about 30 billion kilowatt hours per year, for which the plant will charge 0.37 yuan/kW·h (11 billion yuan/year).[6]

Ningde marks a step in the development of China's domestic nuclear industry. Shu Guogang, GM of China Guangdong Nuclear Power Project said, "We built 55 percent of Ling Ao Phase 2, 70 percent of Hongyanhe, 80 percent of Ningde and 90 percent of Yangjiang Station."[7] Site preparation at Ningde ran through 2007, with the first concrete for Ningde 1 poured in February 2008.[8] Ningde 2 followed nine months later. Construction of each unit is expected to take 58 months.[9] Ningde 1 was grid connected on 28 December 2012 and entered full commercial operation on 18 April 2013.[3][10]

In July 2024, first concrete was poured for Unit 5, the first of two Hualong One reactors.[11]

Reactor data

The Ningde Nuclear Power Plant consist of 4 operational reactors, 1 under construction, and 1 more planned.

Unit Model Net power Gross power Thermal power Start construction First criticality Grid connection Commercial operation Notes
Phase I
Ningde 1 CPR-1000 1018MW 1089MW 2905MW 2008-02-18 2012-11-24 2012-12-28 2013-04-15 [12]
Ningde 2 CPR-1000 1018MW 1089MW 2905MW 2008-11-12 2013-12-20 2014-01-04 2014-05-04 [13]
Ningde 3 CPR-1000 1018MW 1089MW 2905MW 2010-01-08 2015-03-08 2015-03-21 2015-06-10 [14][15]
Ningde 4 CPR-1000 1018MW 1089MW 2905MW 2010-09-29 2016-03-16 2016-03-29 2016-07-21 [16]
Phase II
Ningde 5 HPR-1000 1200 3180 2024-07-28 2029 [17]
Ningde 6 HPR-1000 [18]

See also

References

  1. ^ "Fujian nuclear plants begin construction". People's Daily Online. February 18, 2008. Archived from the original on Jun 5, 2011.
  2. ^ "Nuclear Power in China". Information Papers. World Nuclear Association. 13 August 2024. Retrieved 24 August 2024.
  3. ^ a b "Ningde 1 goes commercial". World Nuclear News. 23 April 2013. Retrieved 23 April 2013.
  4. ^ a b "Ningde Nuclear Power Station Receives Approval". China Energy Daily. 2007-11-13. Retrieved 2009-08-13.[permanent dead link]
  5. ^ "Ningde 4 the latest Chinese reactor project". World Nuclear News. 4 October 2010. Retrieved 2010-10-04.
  6. ^ "China's vice premier stresses improvement of energy structure". Xinhua. February 18, 2008. Retrieved 2009-08-11.
  7. ^ "China aims to build its own nuclear power stations". China Central Television. 2009-07-24. Retrieved 2009-08-13.
  8. ^ "Inauguration of Ningde construction". World Nuclear News. 18 February 2008. Archived from the original on 18 December 2014. Retrieved 13 August 2009.
  9. ^ "Construction gets under way at Chinese sites". World Nuclear News. 24 November 2008. Archived from the original on 25 January 2012. Retrieved 2009-08-13.
  10. ^ "First electricity flows from Ningde nuclear plant". World Nuclear News. 29 December 2012. Retrieved 10 January 2013.
  11. ^ "Construction starts on two new Chinese units". World Nuclear News. 29 July 2024. Retrieved 27 August 2024.
  12. ^ "Ningde 1". Power Reactor Information System (PRIS). International Atomic Energy Agency (IAEA). 2013-04-23. Retrieved 24 April 2013.
  13. ^ "Ningde 2". PRIS. IAEA. 2014-05-08. Retrieved 8 May 2014.
  14. ^ "China's latest new reactor". World Nuclear News. 11 January 2010. Retrieved 2010-01-11.
  15. ^ "Ningde 3". PRIS. IAEA. 2013-04-23. Retrieved 24 April 2013.
  16. ^ "Ningde 4". PRIS. IAEA. 2013-04-23. Retrieved 24 April 2013.
  17. ^ "Ningde 5". PRIS. IAEA. 2024-08-23. Retrieved 2024-08-24.
  18. ^ "Ningde-5 And -6 Will Use Hualong One Design, Says CGN". www.nucnet.org. 2015-07-30. Retrieved 2018-12-07.

 

Index: pl ar de en es fr it arz nl ja pt ceb sv uk vi war zh ru af ast az bg zh-min-nan bn be ca cs cy da et el eo eu fa gl ko hi hr id he ka la lv lt hu mk ms min no nn ce uz kk ro simple sk sl sr sh fi ta tt th tg azb tr ur zh-yue hy my ace als am an hyw ban bjn map-bms ba be-tarask bcl bpy bar bs br cv nv eml hif fo fy ga gd gu hak ha hsb io ig ilo ia ie os is jv kn ht ku ckb ky mrj lb lij li lmo mai mg ml zh-classical mr xmf mzn cdo mn nap new ne frr oc mhr or as pa pnb ps pms nds crh qu sa sah sco sq scn si sd szl su sw tl shn te bug vec vo wa wuu yi yo diq bat-smg zu lad kbd ang smn ab roa-rup frp arc gn av ay bh bi bo bxr cbk-zam co za dag ary se pdc dv dsb myv ext fur gv gag inh ki glk gan guw xal haw rw kbp pam csb kw km kv koi kg gom ks gcr lo lbe ltg lez nia ln jbo lg mt mi tw mwl mdf mnw nqo fj nah na nds-nl nrm nov om pi pag pap pfl pcd krc kaa ksh rm rue sm sat sc trv stq nso sn cu so srn kab roa-tara tet tpi to chr tum tk tyv udm ug vep fiu-vro vls wo xh zea ty ak bm ch ny ee ff got iu ik kl mad cr pih ami pwn pnt dz rmy rn sg st tn ss ti din chy ts kcg ve 
Prefix: a b c d e f g h i j k l m n o p q r s t u v w x y z 0 1 2 3 4 5 6 7 8 9