NEL pipeline
The NEL (Nordeuropäische Erdgasleitung (English: Northern European natural gas pipeline), formerly known as Norddeutsche Erdgasleitung, is a 440 kilometres (270 mi) long natural gas pipeline in Germany. RouteThe pipeline runs from Lubmin near Greifswald through Sülstorf and Achim to Rehden. It connects the Nord Stream 1 pipeline with the Rehden-Hamburg and MIDAL pipelines. The pipeline started operations on 5 November 2012.[1] Between Sülstorf and Achim, it uses a pre-existing installation.[2] Technical featuresThe diameter of the pipeline is 56 inches (1,400 mm) and it uses 100 bars (10,000 kPa) operating pressure.[3] Its capacity is 20 billion cubic metres (710 billion cubic feet) of natural gas per year.[3][4] The pipeline is expected to cost around €1 billion.[5] The developer of the pipeline asked exemption from the network access and transit fees regulation; however, this request was denied.[6] Project companyThe pipeline was built by OPAL NEL TRANSPORT GmbH.[7] It is operated by NEL Gastransport GmbH,[3] owned by WIGA Transport Beteiligungs-GmbH & Co. KG, a joint venture of Wintershall Dea and Gazprom. See alsoReferences
External linksWikimedia Commons has media related to NEL Pipeline. |