Mississippi Highway 477
Mississippi Highway 477 (MS 477) is a highway in Central Mississippi. The southern terminus is at MS 468 in Flowood. The northern terminus is at MS 25 in Flowood. Route descriptionMS 477 starts at MS 468 in Flowood it continues north as Treetops Boulevard and northern terminus is at MS 25.[1] FutureMS 477 is planned to extend to US 80 in Pearl. The plan has existed since 2017 and it might intersect with the Future Interstate 755. Major intersectionsThe entire route is in Rankin County.
See alsoReferences
|