McKalla station is a CapMetro Railhybrid rail station in Austin, Texas, United States. The station was built to provide convenient access to Q2 Stadium.[4] Ground broke on construction on July 18, 2022,[5] and the new station opened on February 24, 2024, coinciding with the first home match of Austin FC's 2024 season.[6][7] The station opened at 10:00 a.m. with a ribbon-cutting ceremony, with rides being free.[8] Construction costs were estimated at $13 million,[9] with total costs estimated at $60 million. The station is double-tracked, includes two regular service side platforms, with the southbound platform serving both northbound and southbound trains during special events[1] and a gated walkway to the east side of the tracks.[2][3] Soon after opening of the new station, along with Broadmoor station to the north, nearby Kramer station is expected to be closed.[4] The station was designed and constructed by Stacy Witbeck.[3] Finishing touches for the station are expected to be completed in April or May 2024.[10]