There are currently two automobile bridges and one railway bridge that cross the Cape Cod Canal, each of which opened in 1935. An earlier set of bridges, also two for automobiles and one for rail traffic, opened between 1911 and 1913. Construction of the Cape Cod Canal began in 1909; the canal initially opened in 1914 and was completed in 1916. Two earlier bridges (one automobile and one railroad) whose construction predated work on the canal and were built to span the Monument River (whose course was largely followed by the canal) are listed for completeness.
Entries in this list are ordered by location along the canal, from Cape Cod Bay to Buzzards Bay.
Due to gridlock during peak summer months, and growing traffic issues even off-season, constructing a third automobile bridge over the canal was a topic of discussion for many years.
Such a bridge was first proposed during the 1950s to connect the proposed Route 25 to U.S. Route 6 north of the canal. The Commonwealth of Massachusetts determined that due to overcapacity on the Sagamore Bridge, a third vehicular crossing would be necessary sometime after 1975. Another proposal, for the Southside Connector expressway, suggested twinning the Bourne Bridge as part of capacity improvements for the roadway.[11] A local farmer fought the state's effort to cross her land with Route 25 for 25 years, eventually winning that fight in 1982.[12]
The proposal for a third crossing was revived under the administration of Massachusetts Governor Deval Patrick. Identifying itself as Project SPAN,[13] the effort floated two plans:
One proposal would involve a three-lane, southbound-only bridge to the west of the current Sagamore Bridge. These additional lanes would allow the Sagamore Bridge's four narrow lanes (two each way) to be reduced to three wider northbound lanes. This proposal also called for open-road tolling, meaning that drivers would not have to slow down. There would also be an access road between Route 25 and Route 3, again proposed to cross the same farmland, which former Massachusetts Highway Administrator Frank DePaola admitted presents environmental challenges.[14]
The other proposal would place an additional bridge between the two bridges, a four-lane span similar to the existing bridges.[15][16][17]
By September 2016, enthusiasm for a third road bridge had cooled and the state reported that it was considering two new bridges that would eventually replace the existing bridges.[18]