Line 2 (Dongguan Rail Transit)

Line 2
 2 
Overview
Other name(s)R2
StatusIn operation
LocaleDongguan, China
Termini
Stations15 (in operation)
Service
TypeRapid transit
SystemDongguan Rail Transit
Operator(s)Dongguan Rail Transit Corporation, Limited
Rolling stock6-car Type B by CRRC Nanjing Puzhen[1] & Bombardier Transportation
History
Opened27 May 2016; 8 years ago (2016-05-27)
Technical
Line length37.7 km (23.43 mi)
Number of tracks2
CharacterUnderground and elevated
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed120 km/h designed, operating maximum 110km/h

Line 2 of the Dongguan Rail Transit (Chinese: 东莞轨道交通2号线; pinyin: Dōngguǎn Guǐdào Jiāotōng Èr Hào Xiàn) is a rapid transit line in Dongguan. The line currently has 15 stations and is 37.743 kilometres (23.452 mi) long, from Dongguan railway station to Humen railway station. It opened on 27 May 2016. Construction of Line 2 began in 2010.[2][3]

Opening timeline

Segment Commencement Length Station(s) Name
Humen Railway Station — Dongguan Railway Station 27 May 2016 37.7 km (23.43 mi) 15 Phase 1 & 2

Stations

The map of Line 2
Station
No.
Station name Connections Nearby bus stops Distance
km
Location
English Chinese
215 Humen Railway Station 虎门火车站 Humen railway station IUQ HMB  GZ-SZ-HK   GSICR 
L1 Shatian 4(沙田4) Houjie 6(厚街6) Houjie 7(厚街7) Humen 8(虎门8) Humen 10(虎门10) Express 15(公交快线15) Express 21(公交快线21) 801 802 808 841 846 855
0.00 0.00 Humen
214 Exhibition Center 展览中心
L1 Houjie 6(厚街6) 801 802 806 808 841
1.94 1.94 Houjie
213 Shanmei 珊美
L1 Shatian 1(沙田1) Houjie 3(厚街3) Houjie 7(厚街7) Houjie 21(厚街21) 801 802 806 808 825 841
3.19 5.13
212 Liaoxia 寮厦
L1 Houjie 1(厚街1) Houjie 17(厚街17) Houjie 20(厚街20) 802 808 831 841 856
3.26 8.39
211 Chenwu 陈屋
L1 Houjie 13(厚街13) Houjie 15(厚街15) Houjie 16(厚街16) 802 831 841
2.22 10.61
210 Gedi 蛤地
Express 1(公交快线1) 34 X12
1.61 12.22 Nancheng
209 Xiping 西平 PRDIR EGQ  GH 
850
1.61 13.83
208 Hongfu Road 鸿福路  1 
C2 C4 X5 9 X11 X13 14 19 27 36 41 46 328 862
1.46 15.29
207 Qifeng Park 旗峰公园
1 K1 LG1 K4 X6 14 18 23 27 37 52 56 X11
2.35 17.64 Dongcheng
206 Dongcheng 东城
4 K4 14 17 27 45 47 56
2.33 19.97
205 Tianbao 天宝
K4 5 K6 Gaoshe 9(高涉9) 13 14 X16 X23 27 49 50 51
4.82 24.79 Guancheng
204 Xiaqiao 下桥
L2 C3 K3 K4 Gaoshe 9(高涉9) X9 X18 19 24 25 32 33 858
1.93 26.72 Dongcheng
203 Liuhua Park 榴花公园
K3 Gaoshe 9(高涉9) 13 19 24 25 47 55 821 822 829 852
2.39 29.11
202 Chashan 茶山
Chashan 1(茶山1) Chashan 3(茶山3) A5 A9 859 861
2.73 31.84 Chashan
201 Dongguan Railway Station 东莞火车站  GS  Dongguan railway station (Guangdong) RTQ
Chashan 1(茶山1) Shilong 1(石龙1) Chashan 2(茶山2) Shilong 2(石龙2) Chashan 3(茶山3) Shilong 3(石龙3) Chashan 4(茶山4) Shilong 4(石龙4) A5 Shilong 5(石龙5) Chashan 6(茶山6) Shilong 7(石龙7) Shilong 8(石龙8) A9 X18 47 805 805A 807 809 813 821 826 828 829 852 859 861
5.21 37.05 Shilong

Future Development

Phase 3

Phase 3 of Line 2 is 17.1 km in length with 9 stations. Construction started in August 2022. It is expected to open in 2027.[4]

Station list[4]

  1. Humen North (虎门北)
  2. Humen Avenue (虎门大道)
  3. Humen Jinjie Road (虎门金捷路)
  4. Humen Guangming Road (虎门光明路)
  5. Binhaiwan (滨海湾)
  6. Qingchuangcheng (青创城)
  7. Gang'ao Ferry Terminal (港澳码头)
  8. Jiaoyiwan West (交椅湾西)
  9. Jiaoyiwan (交椅湾) (interchange with the Northern extension of Shenzhen Metro Line 20 in long-term planning)


See also

References

  1. ^ "2号线_运营线路".
  2. ^ "R2线2011年5月份工程进展". Dongguan Rail Transit. 2011-06-01. Archived from the original on 2012-03-30. Retrieved 2011-08-14.
  3. ^ "东莞首条地铁试运行". 东莞阳光网. 2015-12-29. Retrieved 2015-12-30.
  4. ^ a b "东莞轨道交通2号线三期动工 全长约17.1公里".