Line 19 (Chengdu Metro)
Line 19 of the Chengdu Metro is a metro line in Chengdu. The whole line is 62.69 km. The line uses 8-car Type-A trains operating up to 140 km/h speed powered by 25kV AC overhead lines.[3] It was opened in 18 December 2020 as a part of Line 17 Phase 1. On September 17, 2023, original Line 17 Phase 1: (Jinxing - Jitouqiao) splits into Line 19 Phase 1: (Jinxing - Jiujiang North) and new Line 17: (Jiujiang North - Jitouqiao), and 4-Car A-Train starts operation on Line 17. All passengers must transfer at the same platform at Jiujiang North between line 17 and line 19.[4][5] Line 19 Phase 2 will have local and express services. It will connect Chengdu Tianfu International Airport and Chengdu Shuangliu International Airport with direct express service.[6] Phase 2 has opened on 28 November 2023, of which Tianfu station will only provide interchange with line 18,[7] and will be fully open when Tianfu railway station of China Railway opens.[8] Stations
Notes
References
|
Portal di Ensiklopedia Dunia