Jayadeva Hospital metro station
Jayadeva Hospital is an upcoming double-elevated interchange metro station on the North-South corridor of the Yellow Line and Pink Line[1] of Namma Metro in Bangalore, India. This metro station will be the first multi-elevated interchange metro station in the Namma Metro network. This metro station is named after the Sri Jayadeva Institute of Cardiovascular Sciences and Research which is located nearby and serves MICO Layout (BTM), Gurappanapalya, Jayanagar and JP Nagar 3rd Phase. As per latest reports, the Yellow Line is slated to be operational around April 2025[2] instead of January 2025[3] with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata. Meanwhile, the elevated section of Pink Line covering a distance of 7.5km (Kalena Agrahara - Tavarekere), is expected to be operational around December 2025. [4][5][6] HistoryYellow LineIn December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Jayadeva Hospital metro station along the 6.340 km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 km Yellow Line of Namma Metro. On 16 May 2017, HCC-URC Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[7] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements. Station layoutThis metro station will consist of five levels from underground to the top level as given below:
Station layout (TBC)
See also
References
External linksWikimedia Commons has media related to Namma Metro. Wikivoyage has a travel guide for Bengaluru.
|
Portal di Ensiklopedia Dunia