Hydrogen Challenger
Hydrogen Challenger was a 66-metre (216 ft 6 in) refitted coastal tanker (previously Bernd) for mobile hydrogen production. It was fitted with a vertical axis wind turbine to generate electricity for the electrolysis of water to fill the hydrogen storage tanks. The total storage and transportation capacity was 1194 cubic metres (42200 cu ft). It was stationed in the German Bight near Heligoland (where the most wind is), and was to dock in Bremerhaven, where the hydrogen produced would be delivered to the market. HistoryThe ship was lengthened from 56 to 66 metres (183 ft 9 in to 216 ft 6 in) in 1969. The added section can be seen in front of the bridge. The hydrogen conversion scheme was completed in 2004. However, the project appears to have been a subsidy fraud:
See alsoReferences |
Portal di Ensiklopedia Dunia