Ho Chi Minh City–Long Thanh–Dau Giay Expressway
The Ho Chi Minh City–Long Thanh–Dau Giay Expressway (Vietnamese: Đường cao tốc Thành phố Hồ Chí Minh-Long Thành-Dầu Giây) is an expressway section of the Expressways of Vietnam, 55.7 km long and has its starting point at Long Truong intersection in Thủ Đức and the end point at Dầu Giây Interchange, Thống Nhất district, Đồng Nai. This Expressway is part of the Asian Highway Network (AH1). This route passes through 2 provinces and cities: HCMC and Đồng Nai. PlanningAccording to planning from 2015 to 2021, this entire expressway used to be part of the North-South Expressway[1] before being separated into an independent expressway (only the Long Thành - Lộ 25 section still belongs to this system). However, in reality, this expressway is still denoted as CT.01 on some signposts of this expressway. This expressway is part of the AH1 system (section of Lộ 25 - Long Trường). ConstructionConstructionThe project was started on October 3, 2009 with a scale of 4 lanes and a total length of 55.7 km.[2] The investor is Vietnam Expressway Development Investment Corporation (VEC) with total investment in phase I: 997.67 million USD ((equivalent to 20,630 billion VND) [3].The project is sponsored by the Asian Development Bank (ADB) and the Japan International Cooperation Agency (JICA). CompletionAbout 20 km out of a total of 55 km of the expressway, the section from Ring Road 2 to National Highway 51 in Dong Nai province was opened to traffic on 2 January, 2014.[4].On 29 August, 2014, Ring Road 2 intersection opened to traffic. The 4 km long road from An Phu intersection, Mai Chi Tho Avenue to Ring Road 2 intersection opened to traffic on 10 January, 2015. All The expressway opened to traffic on 2 February, 2015, when the 31 km long Long Thanh - Dau Giay section completed construction. ExtensionCurrently, Vietnam Expressway Development Investment Corporation (VEC) is researching investment in expanding the section from Ring Road 2 intersection to the intersection with Bien Hoa - Vung Tau Expressway, 21.92 km long, from 4 to 8 - 10 lanes, total investment is about 14,786 billion VND. DesignThe expressway has a total length of 55.7 km and is divided into two sections:
Route detailsLanes
LengthTotal length: 55.7 km Speed
List of interchanges and features
References
|
Portal di Ensiklopedia Dunia