D7 motorway (Czech Republic)

D7 Motorway shield}}
D7 Motorway
Dálnice D7
Map
Motorway D7-CZ map.svg
Route information
Length54 km (34 mi)
Planned: 78 km (48 mi)
Major junctions
From D0 in Prague
Major intersections I/13 in Chomutov
ToGerman border near Hora Sv. Šebestiána
Location
CountryCzech Republic
RegionsPraha, Central Bohemian, Ústí nad Labem
Major citiesPrague, Slaný, Chomutov
Highway system
D 6 D 8

D7 motorway (Czech: Dálnice D7) is a motorway connecting Prague to Chomutov, and to the German border. As of 2025, the motorway is 54 km (34 mi) long. Until 31 December 2015, the road was designated as the Expressway R7 (Czech: rychlostní silnice R7)[1].

Course

The D7 motorway is a not yet fully completed motorway leading from Prague through Louny to Spořice near Chomutov[2]. It will be 78 km (48 mi) long once complete and is planned as a four-lane road throughout its entire length.

Prague to Louny

The D7 motorway starts in the north-west of Prague, with a temporary free connection to the I/7 road.

From the Ruzyně off-ramp, the motorway continues in a north-westerly direction towards Slaném, passing the town of Buštěhrad. Near the village of Knovíz, the motorway is currently provisionally terminated and becomes the I/7 road leading up to the junction with the I/16 road at the Slaný-západ MÚK on the right half of the future motorway profile. After completion, the motorway will therefore continue in a north-westerly direction, curving from Knovíz to form the south-western bypass of Slaný, crossing several valleys.

The continuation northwest of Slaný will follow the route of the current I/7 road, which forms the left half of the future motorway profile, except for the section near Písek, where a north-eastern bypass will be created. At Kutrovice, the motorway will then cross a valley, then pass by the village of Třebíz to the border of the Central Bohemia and Ústí nad Labem Region. The section from the border of the regions, including the south-western bypass of the town of Panenský Týnec, was put into operation in December 2021 and followed the previously put into operation section near Sulce (Toužetín), which was put into operation in 2009. From Sulce, it continues past Chlumčany (partially operational in December 2023, fully operational in June 2024) to Louny, where it is connected to its south-western bypass, which was put into operation in September 2023.

Louny to Chomutov

The D7 motorway bypasses the town of Louny on its southwestern edge and creates a southwestern bypass. It will then continue between Louny and Postoloprty in the valley of the Ohře River, to form the northern bypass of Postoloprty. It then leaves the valley of the Ohře River and runs parallel to the Chomutovka River to the town of Chomutov, with the motorway already operational from Postoloprty to Chomutov. The whole section from Postoloprty to Chomutov is typical of the flat landscape. It ends south of Chomutov, and at the Spořice off-ramp, it freely transitions to the I/7 road.

The sections of this motorway already in operation are built in the R 25.5/100 category. The remaining, not yet operational sections of this part of the motorway will also be built in the R 25.5/100 category[3]. A capacity upgrade was carried out on the 4.45 kilometres (2.77 mi) long section in Chlumčany[4].

Future developments

In the future, the D7 will start at an grade separated crossing with the D0 in Prague, next to the settlement of Na Padesátníku. The planning is yet to begin.

Route description

CountryRegionLocationkmmiExitNameDestinationsNotes
Czech RepublicPraguePrague00.0Kilometrage starting point
10.62Přední Kopanina D 0
21.2Aviatická (Letiště)
Central Bohemian RegionCentral Bohemian Region31.9KněževesTemporary start of the motorway
53.1Středokluky
Rest areaOdpočívka Středokluky
74.3Buštěhrad I/61
95.6Stehelčeves
1811Knovíz
Rest areaOdpočívka Netovice
2113Kvíc
2415Slaný-západ
3220Hořešovice
Usti nad Labem RegionUsti nad Labem Region3723Panenský Týnec
Rest areaOdpočívka Smolnice
4528Louny-východ
4930Louny-západ
5333Březno
5635Postoloprty-západ
6037Bitozeves
6540Žiželice I/27
Rest areaOdpočívka Hrušovany
7043Lažany
7547Droužkovice
7848Spořice I/7Kilometrage end point

End of the toll section (only for electronic tolls over 3.5t)


Start of the road for motor vehicles
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Proposed
  •       Unopened

Images

References

  1. ^ "Rychlostní silnice zanikají. Z většiny budou dálnice, na dvou auta zpomalí" (in Czech). 31 December 2015. Retrieved 22 January 2025.
  2. ^ "Transformation of the Czech motorway network will support regional development". Europa Property. 2024-10-22. Retrieved 2025-01-31.
  3. ^ "Kapitola Dálnice D7". Dálnice-Silnice.cz. Archived from the original on 2016-06-17. Retrieved 2025-01-22.
  4. ^ "D7 Chlumčany, zkapacitnění" (PDF). ŘSD. 2024-06-25.

Content in this edit is translated from the existing Czech Wikipedia article at cs:Dálnice D7; see its history for attribution.