The Bukhara–Tashkent–Bishkek–Almaty pipeline is Uzbekistan's main natural gas export pipeline.
History
Construction of the pipeline started in 1967. The pipeline reached Tashkent in 1968, Bishkek (then Frunze) in 1970 and Almaty in 1971.[1]
Description
The diameter of the pipeline is 1,020 millimetres (40 in) and its annual capacity is almost 22 billion cubic meter (bcm) of natural gas.[2] The Bukhara–Tashkent–Bishkek–Almaty pipeline is the main source of gas supply for Kyrgyzstan and southern part of Kazakhstan. It is possible that the pipeline will be connected with the planned Central Asia-China gas pipeline.[3]
Operators
The Kazakhstan section of pipeline is operated by KazTransGas, a wholly owned subsidiary of KazMunayGas. The Kyrgyzstan section of the pipeline is operated by KyrKazGas, the joint venture of KazTransGas and Kyrgyzgas.
Future developments
The technical condition of the pipeline is alarming, particularly in Kyrgyzstan. Therefore, there are plans for construction of a second trunk gas pipeline and renovation of the existing pipeline.[4]
^"Energy". The European Commission's Delegation to Kazakhstan, Kyrgyzstan and Tajikistan. 2006-12-04. Retrieved 2008-02-16. {{cite journal}}: Cite journal requires |journal= (help)[permanent dead link]