Severn Valley Railway

Severn Valley Railway
GWR 5700 Class Pannier tank 5764 crossing the Victoria Bridge.
LocaleWorcestershire and Shropshire
TerminusKidderminster, Bridgnorth
Commercial operations
NameSevern Valley Line
Built bySevern Valley Railway
Original gauge4 ft 8+12 in (1,435 mm) standard gauge
Preserved operations
Operated bySevern Valley Railway (Holdings) plc
Stations8 (including 2 "halts")
Length16 miles (26 km)
Preserved gauge4 ft 8+12 in (1,435 mm) standard gauge
Commercial history
Opened1 February 1862
ClosedJanuary 1970 (Bewdley Station)
Preservation history
1965Severn Valley Railway Preservation Society formed
1970Severn Valley Railway granted Light Railway Order
1970Bridgnorth – Hampton Loade reopened
1974Hampton Loade – Bewdley reopened
1984Bewdley – Kidderminster reopened
HeadquartersKidderminster
Website
svr.co.uk

The Severn Valley Railway is a standard gauge heritage railway in Shropshire and Worcestershire, England, named after the company that originally built the railway over which it now operates. The 16-mile (26 km) heritage line runs from Bridgnorth to Kidderminster, following the course of the River Severn along the Severn Valley for much of its route, and crossing the river on the historic Victoria Bridge.

Train services are hauled by a mixture of steam and heritage diesel locomotives. The railway hosts numerous special events throughout the year, including both steam and diesel galas.[1]

History

Commercial history

The Severn Valley Railway was built between 1858 and 1862, and linked Hartlebury, near Droitwich Spa, with Shrewsbury, a distance of 40 miles (64 km). Important stations on the line were Stourport-on-Severn, Bewdley, and Arley within Worcestershire; and Highley, Hampton Loade, Bridgnorth, Coalport, Ironbridge and Broseley, Buildwas, Cressage, and Berrington in Shropshire.[2]

Although the railway was built by the original Severn Valley Railway Company, it was operated from opening on 1 February 1862 by the West Midland Railway which was absorbed into the Great Western Railway (GWR) on 1 August 1863.[3] As one of the many branch lines on the GWR's extensive network, it was subsequently referred to in GWR timetables as the Severn Valley Branch.[4]

In 1878, the GWR opened a link line between Bewdley and Kidderminster. This meant trains could run direct from the Black Country to areas of Shropshire. Most Kidderminster to Bewdley trains continued through the Wyre Forest line (dismantled in the 1960s and now forming part of National Cycle Route 45) to Tenbury Wells or Woofferton.

At Buildwas Junction (now the site of the former Ironbridge Power Station near what is now Telford) Severn Valley trains connected with services from Wellington to Much Wenlock and Craven Arms.

The line was originally planned as double-track, but was built and operated as a single-track railway. Prior to preservation, the Severn Valley line was never financially successful.[5] Freight traffic, mostly agricultural, and coal traffic from the collieries of Alveley and Highley were the principal sources of revenue. Passenger numbers began to fall after the First World War, particularly at the large intermediate stations of Stourport, Bewdley, and Bridgnorth,[6] with measures such as the opening of halts in the 1930s to attract more local custom having only limited impact. However, the line was strategically useful in the Second World War as an alternative diversionary route around the West Midlands.[7]

After nationalisation in 1948, passenger traffic continued to dwindle. Although the Severn Valley Branch was closed during the Beeching cuts of the 1960s, it was already scheduled for closure prior to the publication of Beeching's report, 'The Reshaping of British Railways', on 27 March 1963. British Railways had announced in January 1962 that the Severn Valley Branch was under review, and the British Transport Commission published closure proposal notices on 1 October 1962 in advance of a meeting of the West Midlands Transport Users Consultative Committee, which took place at Bridgnorth Town Hall on 8 November 1962.[8] Objections to the proposed closure were unsuccessful and the line between Shrewsbury and Bewdley was closed to passenger services on 9 September 1963, and to through freight services on 30 November 1963.[9] Following closure, the track north of Bridgnorth was dismantled. After 1963, the line from Bewdley was retained to serve Alveley Colliery until 1969, while a sparse passenger service continued to link Bewdley with Kidderminster and Hartlebury, until this too ceased in January 1970. Freight traffic between the British Sugar Corporation's Foley Park factory and Kidderminster continued until 1982.

For much of its working life, the Severn Valley line was operated by the Great Western Railway and subsequently the Western Region of British Railways. Today, the Severn Valley Railway operates almost exclusively as a heritage passenger railway.

Heritage railway

The Severn Valley Railway Society was formed in July 1965 by a group of members who wished to preserve a section of the line which had closed in 1963.[10] BR agreed to an offer of £25,000 for the 5+12 miles of the line between Bridgnorth and Alveley Colliery in February 1966 and the Society paid an initial deposit of £2,500 in February 1967. Obtaining a Light Railway Order required a limited company to be formed, with a new Severn Valley Railway Company being incorporated in May 1967. Even at that early date, the objective of the company was to "preserve, retain and restore the standard-gauge railway extending from Bridgnorth to Kidderminster via Bewdley".[11]

The Light Railway Order was granted in May 1970, allowing regular services to begin between Bridgnorth and Hampton Loade; the balance of the £25,000 purchase price being paid to BR on 24 June 1970.[12]

The end of coal trains from the colliery in 1969 allowed SVR to acquire a further 8+12 miles of the line from Hampton Loade to Foley Park in 1972, the purchase price of £74,000 (£1.23 million in 2023)[13] being raised by the flotation of a public company initially under the chairmanship of Sir Gerald Nabarro MP (the line was partly in his former Kidderminster constituency). The share issue took place, but after SVR volunteers discovered he planned to sell the Bridgnorth railway station site for hotel and housing development and bring business friends from outside onto the board, it led to a threatened strike by the railway's volunteer staff and his proposals were thrown out at a heated AGM.[14] Nabarro stood down as chairman in March 1973, being succeeded by Viscount Garnock, and resigned from the board of directors in May 1973.[15] Services were extended to Bewdley in May 1974.[16]

Following the end of freight traffic from the British Sugar factory at Foley Park in 1982, the SVR purchased the final section of the line to Kidderminster at a cost of £75,000 (£334,000 in 2023).[13] The SVR also rented the former Comberton Hill goods yard at Kidderminster from BR, on which a new station would be built. This was achieved in time for services to Kidderminster to begin on 30 July 1984.[17]

Major developments on the SVR since 1984 have included the commissioning of a newly constructed signal box at Kidderminster in 1987, the opening of a new boiler shop at Bridgnorth in 1990, the purchase of the freehold of Kidderminster Town station in 1994, the opening of a new carriage shed at Kidderminster in 2003, the completion of the east wing and canopy of Kidderminster Station in 2006, and the opening of the Engine House Museum at Highley in 2008. 2010 marked the Severn Valley railway's 40th anniversary since opening in 1970 and the 175th anniversary of the formation of the Great Western Railway. 2015 marked the 50th anniversary since the birth of the Severn Valley Railway on 6 July 1965. Special events were staged during both years to mark these anniversaries.[18][19]

Preservation

Severn Valley Railway
Shrewsbury
on bridge over
River Severn
Berrington
Cound Halt
Cressage
Buildwas
Ironbridge level crossing
Ironbridge and Broseley
Jackfield Halt
Coalport West
Linley Halt
Bridgnorth Tunnel (
559 yd
511 m
)
Hollybush Road bridge
Bridgnorth
Eardington Halt
Hampton Loade
Country Park Halt
Alveley Halt
Highley
Arley
Northwood Halt
Bewdley
Rifle Range Halt
Bewdley Tunnel (
480 yd
439 m
)
Foley Park Halt
Kidderminster National Rail & Kidderminster Town Severn Valley Railway

Operations

SVR trains usually operate over the whole line length calling at most stations. The "halts" (Northwood Halt and Country Park Halt) are request stops. Passengers may use these halts during daylight hours only.

In past years services included the Severn Valley Limited and Severn Valley Venturer dining car trains,[20] and diesel-hauled Sunset Special fish-and-chip trains.[21] As of August 2022 the Severn Valley Limited has been reintroduced on selected dates; the other services do not feature in the timetable.

Many special gala days are held, often with visiting engines and rolling stock from other heritage lines; these and other attractions have seen visitor numbers increase and exceed 250,000 per year.

The SVR's rail connection to the National Rail network at Kidderminster permits various track maintenance, weed killing, track measurement and occasional through charter trains to operate from various parts of the country to Bridgnorth. An example of these visitors was that of the Venice-Simplon Orient Express's Northern Belle in 2006. Two direct trains to London Marylebone from Bridgnorth operated by Chiltern Railways ran in 2009, one on 15 August and one on 28 November.[22][23] Some trackwork revisions have been completed at Kidderminster to improve ingress of incoming excursions.

The railway operated two revenue-earning freight trains in May 2007 which carried 6-metre-long pipes from Kidderminster to the Severn Trent water handling plant at Trimpley operated by EWS. Carriage by road of such long pipes would have been difficult because of the narrow roads in the immediate area of Trimpley. In March 2021, the railway acted as a testing ground for the first of the rebuilt Class 69 mainline locomotives.[24]

Furthermore the SVR announced in September 2023 that it had signed a partnership agreement with Network Rail which will allow the railway to obtain professional skills, advice and redundant railway materials to keep it going.[25]

Miniature railways

The Coalyard Miniature Railway also operates passenger trips, and is based at Kidderminster Town station. The Paddock Railway[26] is a 32 mm gauge (1:19 scale) model railway which operates most Sundays at Hampton Loade railway station. Both of these railways are operated by volunteers.

Major infrastructure damage—summer 2007

LMS Stanier Class 5 4-6-0 No.45110 with at Bridgnorth railway station on the re-opening date of 21 March 2008. The locomotive carries a headboard commemorating the re-opening.

On the evening of 19 June 2007, during violent thunderstorms that struck the area, the railway suffered major damage, more extensive than at any other time in its history.[27][28][29] Between Bridgnorth Outer Home signal and Northwood Halt, numerous landslides occurred, with several sections of the line around Fisherman's Crossing and Highley being left suspended in mid-air. A portion of track by Oldbury viaduct was also washed away. Many cuttings were filled with debris, while at Highley, the Up Starter signal and the embankment it used to stand on were washed away due to the torrent of water that had flowed down station road and on to the track. The chalets below the embankment were also washed away. At Hampton Loade, the access road to the railway station – and indeed the only road to the village – was also washed away.[30]

A dozen other heritage railways pledged to help the stricken SVR, including Mid Hants Railway, Gloucestershire Warwickshire Railway, West Somerset Railway, Avon Valley Railway, Dean Forest Railway, Great Central Railway, North Yorkshire Moors Railway and Bluebell Railway.

It was announced on 22 June 2007 that an emergency appeal would be started within days to raise funds for the repair bill.[31] The total cost of the damage was revised upwards as a result of further damage and a massive potential slip in the Northwood Lane area following more rain and flooding in late July. The final repair bill was put at approximately £3.7 million; this was funded by an initial grant from the European Regional Development Fund of £750,000, a grant from Advantage West Midlands of £500,000, £250,000 from the Heritage Lottery Fund, £1 million from the SVR's insurers (£500,000 for embankments, £350,000 for structures, signalling and track, and £150,000 specifically for Borle Viaduct), a further grant of £377,000 from the ERDF, £560,000 from the public appeal and the balance from SVR reserves.[32]

These events damaged the summer tourist trade to the railway, the towns served, and the area as a whole. A noticeable impact to Bridgnorth's tourism was also felt. A spokesman announced on 22 June that the line was expected to reopen between Bewdley and Arley by the end of July and the section between Bridgnorth and Hampton Loade to be up and running by the end of August;[33] however it became apparent in early July 2007 that these reopenings would be delayed by as much as a month, later extended by up to three months. On 19 July, another torrential storm caused further wreckage in at least 45 separate locations as rain fell on the already saturated ground, and in at least ten of these spots damage was so serious that major engineering work was required before reconstruction could get under way.[31] It was also said later that the crucial link between Hampton Loade and Arley, including Highley station and the new Engine House museum, would probably not open until as late as Spring 2008.[34]

The Bridgnorth to Hampton Loade section eventually re-opened on 9 February 2008 for the school half-term. The first passenger train to Hampton Loade since 19 June 2007 departed on time at 10:30, comprising five LMS coaches hauled by 45xx Class no. 4566. The train featured the headboard carried by the first reopening train from Bridgnorth to Hampton Loade in 1970.[35] Although other drainage work enhancements remained to be completed, the line between Kidderminster and Bridgnorth reopened fully to the public on Good Friday, 21 March 2008. The work increased to 144 the number of culverts under the line, where previously there were 44 before the 2007 floods.[36]

Signalling

Down Home Signals for Bridgnorth, cleared for a train to enter Platform 1. These are all lower quadrant semaphores of GWR origin.

With the exception of the connection at Kidderminster to Network Rail metals (which uses a colour light signal) the whole railway is signalled using Great Western style lower quadrant signals, of both metal and wooden pole/arm types. (Exceptionally, the down starter at Highley has a rare concrete post). Each station (not including halts) has a signal box, with Bewdley having two boxes (North and South), due to the size of the layout there (Bewdley originally being a junction station).

Bewdley North signal box interior during operations

All sections between Bridgnorth and Bewdley North operate using the Tyer's Electric Train Token. Both Arley and Hampton Loade signal boxes can be switched out when not required by the service, reducing wear on the mechanics and reducing the number of signalmen required to operate the line. The SVR trains new signalmen. Arley yard may be accessed with the signal box switched out due to the presence of an intermediate token instrument, which also enables a train to depart from or terminate in the yard when the box is switched out.

Bridgnorth also has a ground frame at the northern end of the layout allowing movements from the Hollybush siding (which also serves as the headshunt for locomotives running round their trains) into and out of the Boiler Shop. An Annett's key which unlocks the frame may be obtained by a member of staff when released by a lever in Bridgnorth box.

The Engineer's siding at Eardington is controlled by a ground frame. No intermediate token instrument is provided, with the Highley-Bridgnorth token directly unlocking the two lever frame. This means that Hampton Loade signal box must be switched out when Eardington siding has to be used, and also that a train cannot terminate or depart from there – unless the token is taken by road between Eardington and Highley or Bridgnorth signal box.

Between Bewdley North and Bewdley South the double track section through platforms 1 & 2 is signalled with absolute block. The single track through platform 3 is signalled with direction lever. The line furthest from the main station buildings, known as the Rock siding, is a double-ended siding.[37]

The single line section between Bewdley South and Kidderminster is track circuited throughout and is signalled using acceptance lever.[38] as the preserved SVR passes through the 480 yard long Bewdley Tunnel.

Most of the signal boxes on the line bear original cast iron GWR name plates, with the sole exception being at Bridgnorth which has a replica. The SVR Kidderminster's name plate was recovered from another signal box that formerly stood on the up end of the down platform at Kidderminster station (Network Rail). The lever frame from the same signal box was reused at Arley, which has an LNWR signal box, originally from Yorton after the original was demolished. The replica name plate at Bridgnorth is made of fibre glass, although it is not known if it was moulded from the original or even if the original still exists.

Stations

Point Coordinates
(Links to map resources)
OS Grid Ref Notes
Bridgnorth 52°31′50″N 2°25′15″W / 52.5305°N 2.4208°W / 52.5305; -2.4208 (Bridgnorth Station) SO71559259
Eardington Halt 52°30′06″N 2°24′00″W / 52.5017°N 2.4001°W / 52.5017; -2.4001 (Eardington Halt) SO72938938
Hampton Loade 52°28′26″N 2°22′38″W / 52.4738°N 2.3771°W / 52.4738; -2.3771 (Hampton Loade Station) SO74488627
Country Park Halt 52°27′18″N 2°22′33″W / 52.4549°N 2.3758°W / 52.4549; -2.3758 (Country Park Halt) SO74558417
Alveley Halt 52°27′09″N 2°22′24″W / 52.4524°N 2.3734°W / 52.4524; -2.3734 (Alveley Halt) SO74728389 Closed
Highley 52°26′41″N 2°22′14″W / 52.4448°N 2.3705°W / 52.4448; -2.3705 (Highley Station) SO74918304
Arley 52°25′01″N 2°20′53″W / 52.4170°N 2.3480°W / 52.4170; -2.3480 (Arley Station) SO76427994
Northwood Halt 52°23′39″N 2°19′37″W / 52.3941°N 2.3270°W / 52.3941; -2.3270 (Northwood Halt) SO77847739
Bewdley 52°22′31″N 2°18′22″W / 52.3752°N 2.3061°W / 52.3752; -2.3061 (Bewdley Station) SO79257528
Rifle Range Halt 52°22′08″N 2°17′17″W / 52.3690°N 2.2880°W / 52.3690; -2.2880 (Rifle Range Halt) SO80487458 Closed
Foley Park Halt 52°22′20″N 2°15′37″W / 52.3721°N 2.2604°W / 52.3721; -2.2604 (Foley Park Halt) SO82367492 Closed
Kidderminster Town 52°23′03″N 2°14′24″W / 52.3842°N 2.2400°W / 52.3842; -2.2400 (Kidderminster Town Station) SO83767626
Arley railway station and GWR signal (right), August 1995
Bewdley railway station restored with the GWR ambience

With the exception of the three request halts (Eardington, Country Park and Northwood), all intermediate stations have the ability to pass trains on the single line. However, Highley's passing loop lacks a platform and facing point locks on points to attached sidings, a legal requirement for passenger-carrying line, meaning trains carrying fare-paying passengers may not pass using this loop.[39] It is used for works trains, demonstration goods trains and empty stock workings. A short section of multiple track exists between Bewdley South and Bewdley North signal boxes.

Kidderminster Town station is not an original station. It was created by the SVR, based upon the original GWR station at Ross-on-Wye (1892).[40] Various projects have been carried out by volunteers and contractors to add to the general GWR ambience. Major projects include the porte cochère to the front of the station, the ornamental crestings on the two towers and the canopy over the concourse which was completed in 2006, along with the final, east, wing of the station.

Plans for a significant redevelopment of Bridgnorth station were approved by Shropshire Council in August 2016.[41]

Former stations

A list of the former stations on the Severn Valley Railway, most of which were closed with the Severn Valley line in 1963, after 101 years in use, and never preserved by the current heritage railway due to a multitude of factors, including the lifting of track.

Between Hartlebury and Bewdley:

Between Kidderminster and Bridgnorth:

North of Bridgnorth:

Extensions to the railway

Northwards

Extending the preserved railway north from Bridgnorth was mooted by groups within the SVR as early as the mid-1970s, but the first plan was dismissed as impossible by the then Board of the SVR. For many years the SVR official website confirmed that 'the railway land north of Bridgnorth has been long since sold, and there is now no possibility of Severn Valley trains reaching Ironbridge and Shrewsbury ever again'.[44] In 2002 the Board reported that third party enquiries into the possibility of EU funding to restore rail communication between Bridgnorth and Ironbridge had resulted in press reports that the SVR wished to extend to Ironbridge; the Board agreed that it would monitor developments and would welcome seeing the results of any feasibility study.[45]

In January 2019, Campaign for Better Transport released a report identifying the line between Shrewsbury and Ironbridge which was listed as Priority 2 for reopening. Priority 2 is for those lines which require further development or a change in circumstances (such as housing developments).[46]

In March 2021 an independent group, the Ironbridge Railway Trust (IRT), announced that they had made a bid to the government's 'Restoring Your Railway Ideas Fund' (RYR) to examine re-opening the line between Buildwas and Bridgnorth as a public railway, following the original route of the original Severn Valley branch wherever possible. The IRT application named both the Severn Valley Railway and Telford Steam Railway among the stakeholders, noting that the SVR had expressed an interest in understanding the outputs of the proposed RYR study although no discussions on operational engagement had been held, while the TSR had expressed caution about IRT's concept and proposed a Power Station-Ironbridge tram scheme, but was willing to work together going forward.[47] The bid was considered in the third Ideas Fund round[48] but was not one of the successful bids.[49]

Westwards

The former Tenbury Line trackbed is substantially intact as far as Newnham Bridge station before it is hemmed in by modern development. However, several underbridges are missing, including the substantial Dowles Viaduct over the river Severn, a span over the Bewdley to Bridgnorth road and a brick span at Cleobury. Added to this are the same problems relating to land ownership, realignments of roads at former bridge sites and probable lack of custom at the Newnham Bridge end.

Eastwards

No extension eastwards towards Wolverhampton was ever built, although several schemes were proposed. These included:

  • An act of Parliament[which?] for construction of the Bridgnorth, Wolverhampton and Staffordshire Railway which received royal assent in June 1866. Money could not be raised and the powers lapsed.[50]
  • The Wolverhampton and Bridgnorth Light Railway which was to be built under the terms of the Light Railways Act 1896. The route, which was planned by civil engineer WB Myers-Beswick, would have run from junctions with the GWR and LNWR at Priestfield to join the SVR south of Bridgnorth with a separate station in Bridgnorth Low Town.[50] Further details[where?] show the line of the proposed railway bordered the lane between Sutton Mill and Sutton Farm, Dog Kennel and land owned by a Henry Cavendish Cavendish[who?] and Bridgnorth Rural District Council.
  • The Great Western Railway Act 1905 of 11 July 1905 which granted powers for construction of a line from near Oxley viaduct via Wombourne to join the Severn Valley Line at two junctions 1 mile and 1½ miles south of Bridgnorth. These powers were again granted in the Great Western Railway (Additional Powers) Act 1924 but although the Wombourne branch was completed in 1925, the connection to Bridgnorth was abandoned.[50] There is thought[by whom?] to be some evidence of such a spur from the Severn Valley Line immediately south of Crossing Cottage near Eardington.[citation needed]

Southwards

The SVR owns the trackbed of the former Bewdley to Hartlebury section through Mount Pleasant Tunnel to a point 302 yards beyond its southern portal, approximately mid-way to the former location of Burlish Crossing.[51] In late 2015 the railway announced that Rail Safety Solutions had taken a lease on the portion as far as Mount Pleasant Tunnel, which they will use to provide training to Network Rail apprentices.[52]

Between Burlish and Stourport station, the alignment of the former Bewdley to Hartlebury section has been redeveloped for housing. However, from the Hartlebury direction the trackbed is intact as a bridleway from Mitton (the eastern throat of the original station), with only a span over the A449 Worcester to Kidderminster main road missing. The abutments are intact. Almost all of the trackbed is in council ownership, and in 2007 they expressed an interest in reopening as a commuter line.[53]

Rolling stock

The railway can call on a large fleet to operate its services.[54] Only a small 'core' group of vehicles actually belong to the railway company itself; the remainder are owned by an associated groups, such as the Great Western (Severn Valley Railway) Association,[55][56] or individuals. The SVR is also the base of the West Midland Group, which focuses on DMU preservation. Locomotives and vehicles from the railway are now only infrequently used on excursions on the National Rail network, but in the past have operated across Great Britain.[57]

Maintenance facilities

Locomotive works

The main locomotive works are located at Bridgnorth.[58][59] For health and safety reasons it is not normally open to the public, but guided tours and open days are arranged from time to time. The works facilities include lifting jacks, a Noble and Lund wheel lathe, a wheel drop recovered from Leicester MPD,[60] and a boiler shop with overhead crane. Works to improve natural illumination, waterproof the shed more effectively, and fit the southern end with roller-shutter doors were completed in early 2009, and a further upgrade completed in 2022 included the installation of an overhead crane, replacement of the roof, and a number of environmental initiatives such as conversion to LED lighting.[61]

Traction maintenance depot

Diesel locomotives are maintained at the traction maintenance depot at Kidderminster. A three-road diesel depot building was opened in 2016, with facilities including a pit and an overhead crane.

Carriage works

Although carriage repair and restoration is carried out at a number of locations on the railway, the main carriage repair works is located in the former goods shed at Kidderminster which lies adjacent to the main Birmingham to Worcester line. As well as having a machine shop and fabrication equipment to carry out a full range of body and bogie repairs, the carriage works is also able to calibrate and adjust dynamo voltage regulators and to thoroughly overhaul and test vacuum brake equipment.[citation needed] As with the locomotive works, for health and safety reasons it is not normally open to the public.

The Engine House

Severn Valley Engine House

The Engine House, built on land adjacent to Highley station, provides covered accommodation for locomotives currently out of service, as well as space for displays of other rolling stock and an education/interpretation centre.[62]

Construction and opening

The land on which the Engine House stands was originally the sidings for Highley Colliery and was later used as the "Landsale Yard" for Alveley Colliery. The SVR had planned to use the area for a facility to store and display locomotives that didn't hold current operational certificates as early as 1973.[63] After the opportunity arose to obtain matching Heritage Lottery funding alongside grants from the European Regional Development Fund and Advantage West Midlands, the land was acquired by the SVR in August 2001. Planning permission for development was granted in 2004.[63]

The planned opening in mid-2007 was delayed by the flood damage at Highley in June of that year (see § Major infrastructure damage—summer 2007). It eventually opened to the public on 20 March 2008, on the same day that full line services resumed between Bridgnorth and Kidderminster.[64] An official opening was held on 28 April 2009, attended by the Lord Lieutenant of Shropshire, Algernon Heber-Percy. A second dedication, along with that of the newly constructed footbridge at Highley station, was performed on 21 October 2009 by Prince Richard, Duke of Gloucester, who had been unable to attend the first ceremony due to illness.[65]

In television and film

References

  1. ^ "Severn Valley Railway announces plans to meet challenges of the coming year". Severn Valley Railway. 12 January 2023. Retrieved 23 January 2023.
  2. ^ Siviter, Roger (1995). Past and Present special: The Severn Valley Railway. Wadenhoe: Past & Present Publishing. ISBN 1-85895-080-5.
  3. ^ Marshall 1989, p. 50.
  4. ^ GWR Timetable 1902, P122, etc.
  5. ^ Oppitz, Leslie (2004). Lost Railways of Herefordshire and Worcestershire. Newbury: Countryside Books. p. 52. ISBN 1-85306-754-7.
  6. ^ Vanns 2017, p. 36.
  7. ^ Vanns 2017, p. 43.
  8. ^ Severn Valley Railway Memories, Christopher Magner (1997) pp. 25–26.
  9. ^ Marshall 1989, p. 163.
  10. ^ Marshall 1989, p. 166.
  11. ^ Marshall 1989, pp. 167–168.
  12. ^ Marshall 1989, pp. 172–173.
  13. ^ a b UK Retail Price Index inflation figures are based on data from Clark, Gregory (2017). "The Annual RPI and Average Earnings for Britain, 1209 to Present (New Series)". MeasuringWorth. Retrieved 7 May 2024.
  14. ^ "Santa and the Abominable Showman". Shropshire Star. 19 March 2015. p. 26.
  15. ^ Marshall 1989, pp. 183.
  16. ^ Marshall 1989, pp. 183–187.
  17. ^ Marshall 1989, pp. 191–195.
  18. ^ Severn Valley Railway News 169, Spring 2010, p.4.
  19. ^ Severn Valley Railway News 190, Summer 2015, p.4.
  20. ^ Severn Valley Railway. "Dining Experiences 2020 Diary" (PDF). Retrieved 9 March 2020.
  21. ^ Severn Valley Railway. "Sunset Specials".
  22. ^ Chiltern Railways. "Chiltern Railways direct service from Bridgnorth". Archived from the original on 24 July 2012. Retrieved 11 February 2010.
  23. ^ Chiltern Railways. "Christmas Shopping from the Severn Valley". Archived from the original on 21 July 2012. Retrieved 11 February 2010.
  24. ^ Rail Advent What next for Class 69 locomotives 69001 and 69002? Mid March stay at the Severn Valley Railway
  25. ^ "Railways Go Back To The Future With Landmark Partnership | Severn Valley Railway". 22 September 2023. Retrieved 10 January 2024.
  26. ^ "The Paddock Railway at Hampton Loade SVR". www.paddockrailway.uk.
  27. ^ "Severn Valley Railway". Archived from the original on 28 September 2007.
  28. ^ Jones, Robin (5 July – 1 August 2007). "Preservation's Boscastle! – Severn Valley wrecked by freak £1m storm". Heritage Railway (100): 6–9.
  29. ^ Dunn, Pip (September 2007). "Severn Valley – the aftermath". Railways Illustrated. 5 (9): 20–1.
  30. ^ "Flash floods hit homes and roads". BBC News. 20 June 2007. Retrieved 23 May 2010.
  31. ^ a b "Storm that stopped railway in its tracks". Shropshire Star. 19 March 2015. p. 32.Severn Valley Railway Golden Jubilee Souvenir Special Supplement.
  32. ^ Sowden, Phil (2012). Severn Valley Railway Recollections, the story of the Big Flood.
  33. ^ "SVR's £500k cash plea". Express and Star. Retrieved 10 August 2007.[dead link]
  34. ^ Severn Valley Railway. "Flood Damage Appeal". Archived from the original on 8 August 2007. Retrieved 10 August 2007.
  35. ^ "Picture of first train Bridgnorth – Hampton Loade, February 2008".
  36. ^ "Storm that stopped railway in its tracks". Shropshire Star. 19 March 2015. p. 32.From statement by SVR General Manager, Nick Ralls.
  37. ^ Bewdley Station Official Website. "Bewdley Station History". Retrieved 11 February 2010.
  38. ^ S.V.R. S&T Department. "Bewdley South". Retrieved 11 February 2010.
  39. ^ Williams, David C. (2018). SVR Visitor Guide (10th ed.). Severn Valley Railway. p. 34.
  40. ^ Smith, D. J. (1987). "Kidderminster's extraordinary terminus". Railway Magazine. 133: 227–9.
  41. ^ SVR Website news item Archived 23 August 2016 at the Wayback Machine Retrieved 22 August 2016
  42. ^ "Unlocking Stourport's Past – Stourport Station". Unlocking-stourports-past.co.uk. 3 January 1970. Retrieved 21 January 2013.
  43. ^ Quick, M. E. (2005). Railway Passenger Stations in England, Scotland and Wales: a chronology. Richmond, Surrey: Railway & Canal Historical Society.
  44. ^ "History of the Severn Valley Railway". Consolidation. Archived from the original on 14 March 2013. Retrieved 20 March 2013.
  45. ^ Mellor, David (Winter 2002–03). "Boadroom Notes". Severn Valley Railway News (142): 8, 67.
  46. ^ [1] p.42
  47. ^ "News from the Ironbridge Railway Trust". Ironbridge Railway Trust. 16 March 2021. Retrieved 20 March 2021.]
  48. ^ "Restoring Your Railway Fund: bids received". GOV.UK. Department for Transport. 27 October 2021. Retrieved 28 October 2021.
  49. ^ "Restoring Your Railway Fund: successful bids". GOV.UK. Department for Transport. 27 October 2021. Retrieved 28 October 2021.
  50. ^ a b c Marshall 1989, pp. 114–120.
  51. ^ Marshall 1989, p. 184.
  52. ^ SVR News Issue 192, Winter 2015, General Manager's Notes
  53. ^ "Railway line 'would cut traffic'". BBC News. 28 September 2007. Retrieved 25 October 2007.
  54. ^ Williams, D. C.; McQuade, H. J. (1998). Severn Valley Railway Stock Book. Bewdley; Bridgnorth: Severn Valley Railway.
  55. ^ "GW(SVR)A – Restoring Great Western Railway Rolling Stock". gw-svr-a.org.uk.
  56. ^ Haynes, Mike (Autumn 1998). "25 years later: the Great Western (SVR) Association celebrates 25 years". Severn Valley Railway News. No. 128. pp. 48–52.
  57. ^ Siviter, Roger (2002). "SVR Locomotives on the Main Line". The Severn Valley Railway. Sutton Publishing. pp. 111–127. ISBN 0-7509-2976-6.
  58. ^ Ridgway, C. R. P. (1980). "The Severn Valley Railway – locomotive maintenance at Bridgnorth". Railway World. Vol. 41. pp. 77–83.
  59. ^ Hardingham, Roger (1982). "The Bridgnorth Locomotive Works". Trains Illustrated: Railway Preservation. No. 44. pp. 13–17.
  60. ^ Sowden, Phil (Autumn 2009). "The Wheel-drop at Leicester MPD". Severn Valley Railway News. No. 167. pp. 12–13.
  61. ^ "Branch Lines, August 2022". SVRLive. Severn Valley Railway. August 2022. Retrieved 14 August 2022.
  62. ^ Williams, David C. (2018). SVR Visitor Guide (10th ed.). Severn Valley Railway. p. 33.
  63. ^ a b Vanns 2017, p. 90.
  64. ^ Vanns 2017, p. 93.
  65. ^ Vanns 2017, p. 94.
  66. ^ "50 years of the Severn Valley Railway: We look at films and TV shows it has featured in". nativemonster.com/. Native Monster. Archived from the original on 2 January 2016. Retrieved 3 November 2015.
  67. ^ a b Peter Haining (1994). The Television Sherlock Holmes. Virgin Books. pp. 77–78. ISBN 0-86369-793-3.
  68. ^ "Niven and Co roll in for Disney film caper". Shropshire Star. 19 March 2015. p. 28.Severn Valley Railway Golden Jubilee Souvenir Supplement.
  69. ^ "Victoria Bridge, Worcestershire". Open Buildings. Retrieved 3 November 2015.
  70. ^ Severn Valley Railway News 51, p. 23., article by Avril Rowlands.
  71. ^ "The Box Of Delights – Filming Locations – TV 1984". The Box of Delights archives. 20 November 2014.
  72. ^ "Severn Valley basks in the glow of new 'Sherlock Holmes' film hit". muchwenlocktourism.co.uk. Much Wenlock Tourism. Retrieved 3 November 2015.
  73. ^ "SVR Press Information" (PDF).
  74. ^ "Railway's TV scenes are captured". Bridgnorth Journal. 17 February 2012. p. 10.
  75. ^ "Enola Holmes: When Hollywood stars came to Severn Valley Railway". BBC News. 30 September 2020.

Bibliography

52°23′03″N 2°14′23″W / 52.384244°N 2.239687°W / 52.384244; -2.239687