Monte Cervantes (2004 ship)
Monte Cervantes is a container ship owned by A.P. Moller Singapore Pte. Ltd.[2] and operated by Maersk Line AS.[3] The 272-metre (892 ft) long ship was built at Daewoo Shipbuilding & Marine Engineering[1] in Okpo, South Korea in 2004. Originally owned by Reederei Monte GmbH & Co KG, a subsidiary of Hamburg Süd,[3] she has had two owners and been registered under three flags. The vessel is one of ten ships of the Monte class built for Hamburg Süd by Daewoo Shipbuilding & Marine Engineering and Daewoo Mangalia Heavy Industries between 2004 and 2009.[8] ConstructionMonte Cervantes had its keel laid down on 23 February 2004[1] at Daewoo Shipbuilding & Marine Engineering[1] in Okpo, South Korea. Its hull has an overall length of 272 metres (892 ft).[1] In terms of width, the ship has a beam of 40 metres (130 ft).[1] The height from the top of the keel to the main deck, called the moulded depth, is 24.2 metres (79 ft).[1] The ship's container-carrying capacity of 5,552 twenty-foot equivalent units (TEU) (5,552 20-foot shipping containers)[7] places it in the range of a Post-Panamax container ship.[9] The ship's gross tonnage, a measure of the volume of all its enclosed spaces, is 69,132.[1] Its net tonnage, which measures the volume of the cargo spaces, is 34,823.[1] Its total carrying capacity in terms of weight, is 71,372.9 long tons deadweight (DWT).[1] The vessel was built with a HSD Engine Co. Ltd. 8RTA96C-B[6] main engine, which drives a controllable-pitch propeller. The 8-cylinder engine has a Maximum Continuous Rating of 45,760 kW with 102 revolutions per minute at MCR. The cylinder bore is 960mm. The ship also features 4 main power distribution system auxiliary generators, 3 at 4,100-kilowatt (5,500 hp), and 1 at 2,700-kilowatt (3,600 hp).[6] The vessel's steam piping system features an Aalborg CH 8-500 auxiliary boiler.[6] Construction of the ship was completed on 28 July 2004.[1] Notes
|