Forest Hills station (LIRR)
The Forest Hills station is a station on the Main Line of the Long Island Rail Road (LIRR), located in the Forest Hills neighborhood of Queens in New York City. It is lightly used compared to other stations in the city, with 2,408 daily riders in 2023;[3] many residents opt for the subway because of its more frequent service, cheaper fares, and direct express trains to Midtown Manhattan. The station is wheelchair accessible. LocationLocated in the Queens neighborhood of the same name, the station is situated along the elevated LIRR tracks above 71st Avenue (also known as Continental Avenue) between Austin and Burns Streets. The station is on the north side of brick-paved Station Square, the historic town center of Forest Hills Gardens, a planned community modelled after the garden communities of England.[4] The station building was constructed in the same Tudor style as the building known as the "Forest Hills Inn" located across Station Square.[5] The station is also just east of the West Side Tennis Club. Two blocks to the north along 71st Avenue is the Forest Hills–71st Avenue subway station, one of the busiest in Queens. HistoryBuilt in 1906,[5] the Forest Hills station is one of the oldest operating passenger railway stations in New York City, predating IND subway expansion to the area in the mid 1930s. Being subsequently remodeled for handicapped accessibility with ramps, it does not contain the standard blue and white signage. Instead there are plaques and antique signs that complement the surrounding area. On July 4, 1917, former President Theodore Roosevelt made his "Unification Speech" (also known as "100 Percent American") from the steps of this station.[6] On March 17, 1936, at a hearing of the New York State Transit Commission and the New York State Public Service Commission, the LIRR said that it would seek permission in 1937 to abandon the three stations along the Main Line between Jamaica and Pennsylvania Station—Kew Gardens, Forest Hills, and Woodside. The LIRR had said that it anticipated a loss of annual revenue between $750,000 and $1 million with the opening of the extension of the Independent Subway System's Queens Boulevard Line to Jamaica.[7] In November 1963, the LIRR announced a plan to shorten the platforms at Forest Hills and Kew Gardens by 300 feet (91 m). The railroad's justification was that ridership at the stations was low, and did not warrant repairing the crumbling concrete. These sections of platforms had been installed in about 1929 to allow the stations to accommodate full-length trains. This move was opposed by civic groups, and resulted in an investigation by the Public Service Commission. However, the platform extensions were removed in 1965 or 1966.[8] The Metropolitan Transportation Authority (MTA), in its 2010–2014 capital program, proposed lengthening the four-car-long platforms at Forest Hills and Kew Gardens to allow additional train cars to board at the station. The platform extensions would reduce waiting time at the station while allowing for more efficient operations between Jamaica and Penn Station. Although $4.5 million was allocated for the project, the money was ultimately redistributed to other projects.[9]: 58, 186 [a] On July 26, 2018, it was announced that the LIRR planned to extend the platforms at Kew Gardens and Forest Hills by 200 feet (61 m) to accommodate six-car trains. The platform extensions consisted of fiberglass decking supported by steel scaffolding structures, allowing the extensions to be completed quickly, and at a low cost, while allowing the LIRR to plan a solution for permanent platform extensions. Preparation work began during the week of July 23[2] and the new extensions went into service the week of September 12, 2018.[11][12] As part of improvements included in the Metropolitan Transportation Authority's 2020–2024 capital plan, the station will undergo renovations to make it fully accessible. Two ADA-compliant ramps will be constructed to provide access to both platforms, the existing platforms will be demolished and replaced, and lighting and architectural finishes will be upgraded.[13] Additionally, the platforms will receive permanent extensions to accommodate full 12-car trains.[14]: 10 The MTA board awarded contracts for the accessibility upgrades in December 2023,[15][16] but work on the project was paused in mid-2024 due to the postponement of congestion pricing in New York City, which would have helped fund the renovations.[17] Station layoutA local station, Forest Hills has two side platforms, both six cars long, and four tracks. The relatively flat and straight stretch of track at Forest Hills has been used for PATH PA-1 and R44 speed tests.[18][19]
Gallery
NotesReferences
External linksWikimedia Commons has media related to Forest Hills (LIRR station). |