Cambridge North railway station

Cambridge North
National Rail
Night view of Cambridge North railway station building in May 2017
General information
LocationChesterton, South Cambridgeshire
England
Managed byGreater Anglia
Platforms3
Other information
Station codeCMB
Key dates
21 May 2017[1]Opened
Passengers
2018/19Increase 0.813 million
2019/20Increase 0.950 million
 Interchange  2,940
2020/21Decrease 0.221 million
 Interchange Decrease 539
2021/22Increase 0.734 million
 Interchange Increase 1,437
2022/23Increase 1.075 million
 Interchange Decrease 936
Location
Map
Notes
Passenger statistics from the Office of Rail and Road

Cambridge North railway station is a railway station located in Milton, Cambridgeshire, immediately adjacent to the Cambridge suburb of Chesterton, close to Cambridge Science Park. The station is on the Fen Line, which runs from Cambridge to King's Lynn. It connects to the Cambridgeshire Guided Busway, and provides an interchange with Park & Ride and local bus services.

The station was approved in December 2013; construction commenced in July 2014; and it opened on 21 May 2017,[2] delayed from December 2015.[3]

It has three platforms: platform 1 on the eastern side of the station serves southbound fast services to Cambridge, Stansted Airport, and London King's Cross as well as some morning peak-time services to London Liverpool Street; platform 2 serves northbound services to Ely, King's Lynn and Norwich; platform 3 is a south-facing bay serving semi-fast and slow services to London Liverpool Street via Cambridge and Bishop's Stortford.

A few services King's Lynn to or from London King's Cross pass through without stopping. All Cross Country services to or from Birmingham New Street and Stansted Airport also pass through without stopping. The line speed through Cambridge North is 75mph (120km/h).

History

Proposals

The first proposal for a station serving the north of Cambridge was made in 2003 in the Cambridgeshire and Peterborough Structure Plan, which saw the facility as a means of supporting growth in the Cambridge Sub-Region and of delivering an integrated transport network.[4] A major scheme business case and GRIP 2 study were presented to the Department for Transport in 2007.[5] The business case identified a site on the West Anglia Main Line, approximately 3 miles (4.8 km) to the north of Cambridge station, which is owned by Network Rail and partly leased to English, Welsh and Scottish Railway as stabling sidings.[6] The station would be located on or very near the site of Chesterton railway station which closed in 1850.[7]

The station would provide an interchange facility with the local transport network including the Cambridgeshire Guided Busway and would offer a public transport alternative for trips to the Cambridge Science Park and new development in the Cambridge Northern Fringe.[8] The business case put forward four options for the facility of which its preferred one was a three-platform station comprising a bay platform on the alignment of the former St Ives line and an island platform on the main line.[9] This option was costed at £15 million and showed a benefit-cost ratio of 3.09.[10]

Progress was slow due to a number of issues including the need to retain Chesterton Junction yard[11][12] as an aggregate handling[13] sidings and difficulties in relocating rail freight operations elsewhere, as well as funding difficulties resulting from the loss of the Transport Innovation Fund (TIF) support mechanism and regional planning and associated instruments such as the East of England Regional Funding Assessment.[5][14] Following the demise of the TIF, which led to plans for a congestion charge in Cambridge to be put on hold, Conservative party literature indicated that the station would not go ahead, which prompted local transport group CAST.IRON to propose a cheaper single-platform station in Milton Road as an interim solution.[14][15] By this time, the cost of a new station had risen to £24m, of which £21m had been expected to be provided through government funding, and Cambridgeshire County Council began seeking alternative options.[16] The Council eventually settled on an approach whereby it would provide the initial capital funding and recoup the cost over a period of time from access charges paid by train operating companies.[17]

In February 2011, Cambridge MP Julian Huppert gave his support to the project along with the leader of Cambridge City Council, Sian Reid.[18] In September 2011, Theresa Villiers, the Minister of State for Transport, visited Cambridge, and discussed the proposed station with county council members, saying that the government was interested in further development of the council's proposal.[19]

Approval

In February 2012, Theresa Villiers sent a letter of support to Cambridgeshire County Council indicating that so long as the station's business case remained positive, it would be included in the timetable for the reletting of the East Anglia franchise covering the Fen Line.[20][21] A revised business case produced in 2012 found a benefit-cost ratio of 4.5:1.[22] The Council released details of a proposed service pattern comprising four off-peak Up and Down trains per hour and indicated that the planning process would begin in 2013.[23]

On 18 December 2013, Cambridge City Council approved plans for the new station.[24] Works began in July 2014 to extend the Cambridgeshire Guided Busway to the station site.[25] Completion of the station works was scheduled for December 2015, but this was delayed until May 2017 due to Network Rail's desire to minimise disruption to existing services and its resubmission of plans for the station's construction.[26][27][28][29]

On 19 August 2015, Cambridge City Council approved Network Rail's new plans for the station, which were not substantially different from the original plans put forward by Cambridgeshire County Council in 2013.[30] Following Network Rail's intervention, the cost of the station was revised upwards to £44m.[30]

Naming

The proposed station was initially referred to as "Chesterton" or "Chesterton Interchange".[31] Numerous suggestions were put forward for the official name, including "Stephen Hawking Cambridge Science Park" which was supported by Julian Huppert and Daniel Zeichner.[32] In December 2014, Cambridge City Council and South Cambridgeshire District Council launched a consultation to select the name from a choice of four: Cambridge Science Park, Cambridge North, Chesterton Interchange or Cambridge Fen.[33][34]

On 11 March 2015, councillors at Cambridgeshire County Council voted to recommend to Network Rail that the station should be called Cambridge North.[35] According to Graham Hughes, the council's director of economy, transport and environment, stated that the name would provide a good indication of the station's geographical location, adding that calling it "Cambridge Science Park" could be misleading as that was situated 34 mile (1.2 km) away and, in any event, Trinity College, which owns the Science Park, had not come out in support.[35] By contrast, St John's Innovation Centre was closer and landowners, including the Crown Estate, had been lobbying to have the station named "The Business Park".[35]

Opening

The station just before opening, pictured on 20 May 2017

It was intended that the interior fit-out of the station take place between October 2016 and February 2017. On New Year's Eve 2016, new signalling and a crossover for the bay platform was installed.[36] The infrastructure was authorised for passenger use by April 2017 and the station's opening and first timetabled passenger services went ahead on 21 May 2017.[2][36] Approximately 320,000 passengers used the station in its first 12 months of operation.[37]

Facilities

Cambridge North railway station platforms in May 2017

The original design for the station was submitted by Atkins; this was revised by Network Rail when it became the principal contractor.[38][39] Network Rail updated the car park's design to maximise its potential as a park and ride facility.[39]

Detail of cladding viewed from overbridge in May 2017

The facilities comprise a 450-square-metre (4,800 sq ft) station building comprising a passenger waiting area, toilets, ticket office, retail and amenity space, and staff accommodation.[40] An overbridge links the building with two 254-metre (833 ft) platforms capable of accommodating 12-car trains.[36] The easternmost platform faces the up line of the Fen Line, while the second platform is an island platform with the down Fen Line on one side and a south-facing bay platform on the other.[36] Two relaid freight lines for Lafarge run next to the bay platform.[36]

Interchange facilities are provided in the form of a 450-space car park, a cycle space for 1,000 bikes, new pedestrian and vehicular access from Cowley Road and a 1 kilometre (0.62 mi) extension of the Cambridgeshire Guided Busway from Milton Road.[21][27][40][36][41] The Cambridge Cycling Campaign published their proposals for integration of the new station with cycling and pedestrian facilities in November 2012.[42] The cycle park canopy is fitted with solar panels generating 49 kWp or roughly 10% of the station's power needs.[citation needed]

The cladding of the building features a pierced design derived from Rule 30,[43] a cellular automaton introduced by Stephen Wolfram in 1983.

Abbey-Chesterton Bridge

The cycle and pedestrian Abbey-Chesterton Bridge, with the railway bridge behind

On 23rd December 2021, the Abbey-Chesterton Bridge over the River Cam opened, providing cycle and pedestrian access to the station from the Abbey district of Cambridge and from Fen Ditton. The bridge is part of the Chisholm Trail, a footpath and cycle route linking Cambridge Science Park with Addenbrookes Hospital and Cambridge Biomedical Campus in the south of the city. [44] The bridge provides pedestrian access to the Abbey Stadium, Cambridge United Football Club's home ground, approximately 1.5km (1 mile) away.

Services

Cambridge North railway station ticket barriers with lists of connections on the screens behind, pictured in May 2017

Services at Cambridge North are operated by Great Northern and Greater Anglia using Class 387 and 720 EMUs and Class 755 bi-mode trains.

The typical off-peak service in trains per hour is:[45]

During the peak hours, the services to London King's Cross call additionally at Royston and Letchworth Garden City and the northbound services to Ely are extended to King's Lynn.

The station is also served by a single peak hour service between London Liverpool Street and King's Lynn, operated by Greater Anglia.

Preceding station National Rail National Rail Following station
Great Northern
Greater Anglia
Peak Hours Only
Greater AngliaTerminus
Greater Anglia
Peak Hours Only

See also

Cambridge South railway station, new station under construction in the south of Cambridge.

References

  1. ^ "LIVE: Passengers board the first train at Cambridge North Station". Metro. Allied Newspapers Ltd. 21 May 2017. Retrieved 21 May 2017.
  2. ^ a b "Network Rail Enhancements Delivery Plan December 2016" (PDF). 22 December 2016. Archived from the original (PDF) on 30 December 2016. Retrieved 29 December 2016.
  3. ^ "Cambridgeshire's new railway station hit by more delays". ITV News.
  4. ^ Network Rail (April 2015). Chesterton Interchange Station (PDF) (Report). para. 1.2.1. Archived from the original (PDF) on 30 November 2016. Retrieved 29 November 2016.
  5. ^ a b Network Rail (2015), para. 1.2.3
  6. ^ Atkins (May 2007). Chesterton Interchange - Major Scheme Business Case (PDF) (Report). paras. 2.1, 2.2 and 2.4. Archived from the original (PDF) on 9 June 2011.
  7. ^ Kitson, Paul (30 August 2015). "Cambridge - Its Railways and Station". Disused Stations. Retrieved 1 December 2016.
  8. ^ Atkins (2007), para. 2.38
  9. ^ Atkins (2007), para. 2.51
  10. ^ Atkins (2007), tables 2.7 and 2.8
  11. ^ Network Rail (June 2015). East Anglia Route Sectional Appendix. Vol. Module EA. p. 112 LOR EA1061 Seq010. NR30018/02.
  12. ^ "Chesterton junction railway yard - Derelict sites". 12 August 2006. Retrieved 30 November 2016.
  13. ^ "JOINT DEVELOPMENT CONTROL COMMITTEE (CAMBRIDGE FRINGE SITES) - Tarmac Lafarge aggregate rail terminal" (PDF). 18 February 2015. Retrieved 30 November 2016.
  14. ^ a b "Cambridge congestion charge plans on hold". BBC News Online. 10 March 2010. Retrieved 29 November 2016.
  15. ^ "Cambs County council acknowledges that public money for Chesterton station may not be available and considers private funding". Railfuture. 26 July 2010. Retrieved 29 November 2016.
  16. ^ "Councillors seek funding for new Cambridge station". Rail Professional. 13 July 2010. Retrieved 29 November 2016.
  17. ^ Local Transport Today (16 March 2012). "Cambs plans to borrow to fund new rail station". Retrieved 29 November 2016.
  18. ^ "MP backs £21m rail project for Chesterton". Cambridge News. Cambridge. 22 February 2011. p. 2, right-most column. Archived from the original on 1 February 2014. Retrieved 21 January 2014.
  19. ^ McGurran, Deborah (10 September 2011). "Rail minister sends positive signals on East rail plans". BBC News. Retrieved 16 October 2011.
  20. ^ Orson, Charlotte (24 February 2012). "City MP's bid for Cambridge Science Park Station to open in 2014". Cambs Times. Archived from the original on 30 November 2016. Retrieved 29 November 2016.
  21. ^ a b "Cambridge's new railway station 'to open in 2015'". Cambridge News. 21 February 2012. Archived from the original on 24 February 2012. Retrieved 21 February 2012.
  22. ^ Cambridgeshire County Council (2013). "Cambridge Science Park Interchange Socio-Economic Impacts" (PDF). p. 9. Archived from the original (PDF) on 30 November 2016. Retrieved 29 November 2016.
  23. ^ "On track to move Science Park Station from concept to reality". Cambridgeshire County Council. 21 February 2012. Archived from the original on 5 September 2012. Retrieved 24 February 2012.
  24. ^ Heart 103 (18 December 2013). "Cambridge: Science Park Station Approved". Retrieved 29 November 2016.{{cite web}}: CS1 maint: numeric names: authors list (link)
  25. ^ "PICTURES: First step towards opening of Cambridge's second railway station as work starts on guided busway extension". Cambridge News. 23 July 2014. Archived from the original on 5 September 2014. Retrieved 15 September 2014.
  26. ^ "Cambridge Science Park station to incorporate Game of Life". Railway Gazette. 13 January 2014. Retrieved 25 May 2014.
  27. ^ a b Havergal, Chris (8 March 2014). "Cambridge Science Park train station opening date pushed back to 2016". Cambridge News. Archived from the original on 9 March 2014. Retrieved 29 November 2016.
  28. ^ Dickinson, Eleanor (14 February 2015). "Cambridge Science Park station delayed again". Cambridge News. Archived from the original on 16 December 2015. Retrieved 29 November 2016.
  29. ^ ITV News (22 January 2016). "Cambridgeshire's new railway station hit by more delays". Retrieved 29 November 2016.
  30. ^ a b "Second Cambridge station plans gets go-ahead". BBC News Online. 19 August 2015. Retrieved 29 November 2016.
  31. ^ "Cambridgeshire County Council launch consultation on new Local Transport Plan". Railfuture. 1 May 2013. Retrieved 1 December 2016.
  32. ^ Brown, Raymond (7 November 2014). "Could new rail station for Cambridge be named after Prof Stephen Hawking?". Cambridge News. Archived from the original on 11 November 2014. Retrieved 29 November 2016.
  33. ^ South Cambridgeshire District Council (8 December 2014). "Cambridge Northern Fringe East Action Plan: Have your say" (PDF). p. 3. Archived from the original (PDF) on 1 December 2016. Retrieved 1 December 2016.
  34. ^ Cambridge City Council (8 December 2014). "Cambridge Northern Fringe East area action plan: Issues and options consultation". Archived from the original on 21 September 2016. Retrieved 1 December 2016.
  35. ^ a b c "New train station in north Cambridge should be called...Cambridge North, say councillors". Cambridge News. 12 March 2015. Archived from the original on 15 March 2015. Retrieved 1 December 2016.
  36. ^ a b c d e f Stephen (2016), p. 95
  37. ^ MacKenzie, Oliver (24 May 2018). "Cambridge North is one year old and it's changing the face of the city". cambridgenews. Retrieved 25 May 2018.
  38. ^ Atkins (14 January 2014). "Atkins designed Cambridge Science Park station gets green light". Retrieved 1 December 2016.
  39. ^ a b Stephen, Paul (31 August – 13 September 2016). "The £50m stimulus to Cambridge's needs". RAIL. No. 808. p. 93.
  40. ^ a b Atkins (May 2015). "Cambridge Science Park Station Interchange Transport Assessment" (PDF). para. 4.2. Retrieved 1 December 2016.[dead link]
  41. ^ "New train station at Chesterton". Unclog Cambridge. Retrieved 12 January 2010.
  42. ^ "Science Park Station 7 Improvements needed". Cambridge Cycling Campaign. Retrieved 8 November 2012.
  43. ^ "Right answer for the wrong reason: cellular automaton on the new Cambridge North station | The Aperiodical". aperiodical.com. Retrieved 23 May 2017.
  44. ^ Gemma Gardner (23 December 2021). "First stage of Chisholm Trail walking and cycling route across Cambridge opens". Cambridge Independent. Retrieved 31 December 2021.
  45. ^ Table 17, 22, 25 National Rail timetable, May 2022

52°13′24″N 0°9′28″E / 52.22333°N 0.15778°E / 52.22333; 0.15778

Read other articles:

Company The topic of this article may not meet Wikipedia's notability guideline for web content. Please help to demonstrate the notability of the topic by citing reliable secondary sources that are independent of the topic and provide significant coverage of it beyond a mere trivial mention. If notability cannot be shown, the article is likely to be merged, redirected, or deleted.Find sources: AppJet – news · newspapers · books · scholar · JSTOR (August 2…

Laix La mairie. Héraldique Administration Pays France Région Grand Est Département Meurthe-et-Moselle Arrondissement Briey Intercommunalité CA Grand Longwy Agglomération Maire Mandat Hervé Jacquet 2020-2026 Code postal 54720 Code commune 54290 Démographie Populationmunicipale 210 hab. (2021 ) Densité 28 hab./km2 Géographie Coordonnées 49° 26′ 50″ nord, 5° 46′ 50″ est Altitude Min. 275 mMax. 397 m Superficie 7,55 km2 Type …

Nizhny Tagil Нижний ТагилKota BenderaLambang kebesaranPeta lokasi Nizhny Tagil Lua error in Modul:Infobox_mapframe at line 86: bad argument #1 to 'sqrt' (number expected, got nil).Nizhny TagilLokasi Nizhny TagilTampilkan peta Sverdlovsk OblastNizhny TagilNizhny Tagil (Rusia)Tampilkan peta RusiaKoordinat: 57°55′N 59°58′E / 57.917°N 59.967°E / 57.917; 59.967Koordinat: 57°55′N 59°58′E / 57.917°N 59.967°E / 57.917; 59.967Nega…

Events after the end of the war in 1945 World War II Navigation CampaignsCountriesEquipment TimelineOutlineListsHistoriography CategoryBibliography vte Timelines of World War II Chronological Prelude (in Asiain Europe) 1939 1940 1941 1942 1943 1944 1945 onwards By topic Diplomacy Declarations of war EngagementsOperations By theatre Battle of Europe air operations Eastern FrontManhattan Project United Kingdom home front Surrender of the Axis armies vte The aftermath of World War II saw the rise o…

2006 live album by PocoThe Wildwood SessionsLive album by PocoReleased6 December 2006RecordedOctober 2003VenueThe Wildwood Lodge, Steelville, MOGenreCountry rockLength41:29LabelDrifter's ChurchPoco chronology Bareback At Big Sky(2005) The Wildwood Sessions(2006) All Fired Up(2014) The Wildwood Sessions is the sixth live album by the country rock band Poco.[1] The album was recorded live at The Wildwood Lodge in Steelville, MO.[2] Track listing Grand Junction (Rusty Young)…

Richard WilliamsWilliams di Festival Film Animasi Internasional Annecy 2015LahirRichard Edmund Williams[1](1933-03-19)19 Maret 1933Toronto, Ontario, KanadaMeninggal16 Agustus 2019(2019-08-16) (umur 86)Bristol, Britania RayaKebangsaanKanadaAlmamaterNorthern Secondary SchoolPekerjaanAnimator, pengisi suara, penulisTahun aktif1957–sekarang (karier animasi)Suami/istriMargaret FrenchImogen Sutton (istri saat ini)Anak4 Richard Edmund Williams (19 Maret 1933 – 16 Agustus 2019) ada…

Державний комітет телебачення і радіомовлення України (Держкомтелерадіо) Приміщення комітетуЗагальна інформаціяКраїна  УкраїнаДата створення 2003Керівне відомство Кабінет Міністрів УкраїниРічний бюджет 1 964 898 500 ₴[1]Голова Олег НаливайкоПідвідомчі орг…

Pre-conquest law in England The initial page of Rochester Cathedral Library, MS A.3.5, the Textus Roffensis, which contains the only surviving copy of Æthelberht's laws. This article is part of the series:Anglo-Saxonsociety and culture People Settlement Women History Language Language Literature Runes Material culture Architecture Art Burial Coins Dress Glass Weaponry Power and organization Charters Government Law Monarchs and kingdoms Warfare Military Religion Christianity Paganism vte Anglo-S…

Overview of the philosophy of artificial intelligence See also: Ethics of artificial intelligence Part of a series onArtificial intelligence Major goals Artificial general intelligence Recursive self-improvement Planning Computer vision General game playing Knowledge reasoning Machine learning Natural language processing Robotics AI safety Approaches Symbolic Deep learning Bayesian networks Evolutionary algorithms Situated approach Hybrid intelligent systems Systems integration Applications Proj…

 本表是動態列表,或許永遠不會完結。歡迎您參考可靠來源來查漏補缺。 潛伏於中華民國國軍中的中共間諜列表收錄根據公開資料來源,曾潛伏於中華民國國軍、被中國共產黨聲稱或承認,或者遭中華民國政府調查審判,為中華人民共和國和中國人民解放軍進行間諜行為的人物。以下列表以現今可查知時間為準,正確的間諜活動或洩漏機密時間可能早於或晚於以下所歸類…

Patrick McHenry Patrick Timothy McHenry (lahir 22 Oktober 1975) adalah anggota DPR Amerika Serikat. Ia adalah anggota Partai Republik. Ia sebelumnya juga menjabat sebagai anggota DPRD Carolina Utara untuk masa jabatan tunggal. Pranala luar Congressman Patrick McHenry official U.S. House website Patrick McHenry for Congress Patrick McHenry di Curlie (dari DMOZ) Kemunculan di C-SPAN Biografi di Biographical Directory of the United States Congress Catatan suara dikelola oleh The Washington Post Bio…

1924 novel by H. G. Wells The Dream First editionAuthorH. G. WellsIllustrator'Horosho'CountryUnited KingdomLanguageEnglishPublisherJonathan CapePublication date1924[1]Media typePrint (Hardbound and paperback)Pages320 pp[1] The Dream is a 1924[1] novel by H. G. Wells about a man from a Utopian future who dreams the entire life of an Englishman from the Victorian and Edwardian eras, Harry Mortimer Smith.[2] As in other novels of this period, in The Dream Wells …

Type of chromatography This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Gas chromatography – news · newspapers · books · scholar · JSTOR (November 2020) (Learn how and when to remove this message) Gas chromatographyA gas chromatograph with a headspace samplerAcronymGCClassificationChromatographyAnalytes Organic …

Reservoir in Montana Fort Peck LakeThe lake seen from the Lewis and Clark Overlook east of the damFort Peck LakeShow map of MontanaFort Peck LakeShow map of the United StatesLocation Montana,  United StatesCoordinates47°46′41″N 106°40′53″W / 47.77806°N 106.68139°W / 47.77806; -106.68139[1]Lake typeReservoirPrimary inflowsMissouri River, Musselshell River, Fourchette Creek, Dry CreekPrimary outflowsMissouri RiverCatchment area57,500 sq…

Ular jali mandarin Euprepiophis mandarinus Status konservasiRisiko rendahIUCN192138 TaksonomiKerajaanAnimaliaFilumChordataKelasReptiliaOrdoSquamataFamiliColubridaeGenusEuprepiophisSpesiesEuprepiophis mandarinus (Cantor, 1842) Tata namaSinonim takson Coluber mandarinus Cantor, 1842 Ablabes pavo Annandale, 1912 Elaphe mandarinus — Stejneger, 1925 Elaphe takasago Takahashi, 1930 Holarchus roulei Angel & Bourret, 1933 Elaphe mandarina — M.A. Smith, 1943 Euprepiophis mandarinus — Utiger et …

Lorenzo Valla Lorenzo Valla (Roma, 1407 – Roma, 1º agosto 1457) è stato un umanista, filologo classico, scrittore e filosofo italiano. Si presentava anche con il nome latino Laurentius Vallensis. Indice 1 Biografia 1.1 Gioventù 1.2 Il periodo pavese 1.3 Il periodo napoletano 1.4 L'ultima fase 1.5 Note caratteriali 2 Importanza storica 3 Scritti filologici 4 Scritti critici 5 Fondazione Valla 6 Edizioni delle opere 7 Note 8 Bibliografia 9 Voci correlate 10 Altri progetti 11 Collegamenti este…

يفتقر محتوى هذه المقالة إلى الاستشهاد بمصادر. فضلاً، ساهم في تطوير هذه المقالة من خلال إضافة مصادر موثوق بها. أي معلومات غير موثقة يمكن التشكيك بها وإزالتها. (أكتوبر_2013) تيزقار معلومات شخصية تعديل مصدري - تعديل   تيزقار الكيشي وهو الملك السومري التاسع عشر لسلالة كيش الأولى …

Pour les articles ayant des titres homophones, voir Arnaud-Bernard et Bernard Arnaud. Pour les articles homonymes, voir Arnault. Bernard ArnaultBernard Arnault en 2017.FonctionsGérantAgache SEdepuis 2022Président-directeur généralLVMH Moët Hennessy Louis Vuittondepuis janvier 1989PrésidentChristian Diordepuis 1984Président-directeur généralFinancière Agachedepuis 1984Président-directeur généralFerret-Savinel (d)1947-1976BiographieNaissance 5 mars 1949 (75 ans)Roubaix (France)No…

Sochi 2014 XXII Juegos Olímpicos de Invierno Logo oficial de los Juegos Olímpicos de Invierno de 2014.Localización Sochi Federación RusaParticipantes • Países • Deportistas 882871Eventos 98 en 15 deportes olímpicosLema «Жаркие. Зимние. Твои» (en español: «Calientes. Fríos. Tuyos»)CeremoniasApertura 7 de febrero de 2014Clausura 23 de febrero de 2014Inaugurado por Vladímir PutinJuramentos  • Deportista • Juez…

R&S Records Aktive Jahre 1984–2000, seit 2008 Gründer Renaat Vandepapeliere, Sabine Maes Sitz Gent (1982–2000), London (seit 2009) Website rsrecords.com Sublabel(s) All Good Vinyl, Apollo, Cutty Shark, Diatomyc, ETC, Generations, Global Cuts, Labirynt Records, Limited Club Edition, Maffia Music, Milos Music Belgium, No Label Records, Outrage Recordings, R&S Laboratories, Satori, TNI, TZ R&S Records ist ein 1984 gegründetes Plattenlabel, das mit zahlreichen Veröffentlichungen a…