^2. Project description and Justification, Zambia Botswana Kazungula Bridge Project ESIA Summary July 2011(PDF), African Development Bank Group: 2, July 2011 [30 January 2018], (原始内容(PDF)存档于6 November 2015), The bridge has been designed as an extra-dosed road-rail bridge configuration with middle deck sections of 129m, and 4 piers in the river, with a total length of 923m. It follows a curved alignment layout to avoid the border area in the Zambezi waters between Botswana and Zimbabwe, where the exact border positions have not been ratified.
^Reuters. Botswana says China agreed to extend loan and cancel debt. September 9, 2018 [2021-10-30]. (原始内容存档于2021-11-04). The bulk of the loan is expected to fund the Mosetse-Kazungula railway line project, which will link the central part of Botswana to the tourism hub in the northwest. The railway line will also promote regional trade as it will connect Botswana to Zambia via the Kazungula Bridge, currently under construction.