West Coast MRT station is a future underground Mass Rapid Transit station on the Cross Island line (CRL) located in Clementi, Singapore. It will serve West Coast Road, West Coast Highway and West Coast Drive. First announced in September 2022, the station is expected to be completed in 2032 along with the other CRL Phase 2 stations.[3]
History
West Coast station was first announced on 20 September 2022 by Transport Minister S Iswaran. The station will be constructed as part of Phase 2 of the Cross Island line (CRL), a 15-kilometre (9.3 mi) segment spanning six stations from Turf City station to Jurong Lake District station.[4] The station is expected to be completed in 2032.[5]
Two properties belonging to JTC at Pandan Loop Industrial Estate southwest of the station will be acquired for the construction of the station.[6] The contract for the construction of West Coast station and associated tunnels was awarded to Gamuda Berhad Singapore Branch for S$510 million (US$373.8 million) in December 2023.[7][8][9] In June 2024, the contract for the construction of tunnels between the West Coast and Jurong Lake District stations was awarded to a joint venture between Nishimatsu Construction Co Ltd and Okumura Corporation for S$242 million (US$177.4 million).[10]
Details
West Coast station will serve the Cross Island line (CRL) and have an official station code of CR18. The station will be located at the site of Tanglin Secondary School,[11] which was previously announced to merge with New Town Secondary School given falling enrolment and future development plans.[12] Residents raised concerns that the station was not situated in the West Coast town centre, but transport minister Iswaran clarified that the site was chosen for its proximity to residential estates and future industrial developments, which would allow the station to serve both areas.[13][14] A mixed-use development above the station is being planned and will be integrated with the station.[15]
References
^"跨岛线第二阶段将有六个地铁站 预计2032年竣工". 早报 (in Chinese). 20 September 2022. Archived from the original on 21 September 2022. Retrieved 20 September 2022.
^刘智澎 (24 September 2022). "易华仁:仍在探讨兴建西海岸延长线是否可行" [Iswaran: Still discussing whether the construction of the West Coast extension is feasible]. Zaobao (in Simplified Chinese). Archived from the original on 24 September 2022. Retrieved 24 September 2022.