Walrus-class submarine

Class overview
NameWalrus class
BuildersRotterdamsche Droogdok Maatschappij
Operators Royal Netherlands Navy
Preceded by
Succeeded byOrka class
Costƒ500 million per unit (1992)[1]
Built1979–1992
In commission1990–present
Planned6[2]
Completed4
Cancelled2
Active3
Retired1
General characteristics [3][4][5]
TypeDiesel-electric attack submarine
Displacement
  • 2,450 t surfaced,
  • 2,800 t submerged,
  • 1,900 t standard
Length67.725 m (222 ft 2.3 in)
Beam8.40 m (27 ft 7 in)
Draft6.60 m (21 ft 8 in)
Propulsion
Speed
  • 13 knots (24 km/h; 15 mph) surfaced,
  • 21 knots (39 km/h; 24 mph) submerged
Range18,500 km (10,000 nmi) at 9 kn (17 km/h; 10 mph)
Test depth>300 m (980 ft)
Complement49 to 52
Sensors and
processing systems
  • Radars:
  • Signaal/Decca 1229
  • Signaal ZW-07
  • Argo Phoenix I
  • Sonar Systems:
  • Thomson Sintra TSM 2272 Eledone Octopus
  • GEC Avionics Type 2026 towed array
  • Thomson Sintra DUUX 5 passive ranging and intercept
  • Fire-control system:
  • HSA GIPSY (SEWACO VIII)
Armament

The Walrus-class submarine is the only submarine class currently in operation in the Royal Netherlands Navy. The boats have been in service since 1990 and are all named after sea mammals.

Background

In 1974, the Royal Netherlands Navy announced, through the Ministry of Defence's 10-year plan Defensienota 1974 [nl], that it wanted to replace its aging Dolfijn-class submarines.[6] Since the 1960s, the Royal Netherlands Navy had been conducting studies and research into a suitable replacement attack submarine.[7] This research initiative concluded that the Netherlands should build conventional diesel-electric submarines, as nuclear submarines were costly and could only be constructed, crewed, and maintained by countries with major navies such as the United States, France and the United Kingdom. Nonetheless, even with the diesel-electric submarine, the Dutch government sought to work together with international allies to reduce construction costs.[6]

The Walrus-class Zeeleeuw under construction at Rotterdam in 1987

Between 1975 and 1978, the design of the Walrus class was for the most part completed, and included many improvements which would result in new, state-of-the-art submarines that would mark a significant improvement over previous submarines used by the Royal Netherlands Navy.[8] For example, a special kind of French-produced steel was used to construct the hull of the Walrus-class submarines; this steel proved to be more elastic, allowing submarines of the class to dive deeper than previous submarines. Furthermore, there was a focus on automation which was aimed at decreasing the manpower required to operate the submarines, while also making them more effective against threats.[9]

On 19 June 1979, Minister of Defense Willem Scholten signed a contract worth 425 million guilders with the Rotterdamsche Droogdok Maatschappij (RDM) to build two submarines to replace the Dolfijn-class submarines, with the construction of the second boat to commence the following year.[10] Soon, RDM noticed that the new submarines could not be built the same way as the Zwaardvis-class submarines; it had to use new techniques to build the submarines.[8] Furthermore, the design was constantly modified to incorporate new developments in the submarine world, which led to issues that slowed the building process.[9] Nonetheless, construction continued and on 11 October 1979, HNLMS Walrus was laid down.[2] Two years later, on 24 September 1981, HNLMS Zeeleeuw was laid down.[4]

Unexpectedly, on 19 February 1983, RDM's parent company Rijn-Schelde-Verolme declared bankruptcy, despite successive governments providing 2.2 billion guilders in state aid to RSV.[11][12] This was problematic because the construction of the Walrus-class submarines was far from completion. To ensure construction of the submarines continued, RDM was re-established as an independent company.[2] Furthermore, the Royal Netherlands Navy ordered an additional two Walrus-class submarines earlier than planned to assist RDM financially.[9] However, at this time the Walrus-class submarines were facing many problems.[13]

Walrus in 1987 following repairs after the fire which resulted in serious damage to the command centre

New problems arose on 14 August 1986, when the command centre of Walrus caught fire, while it was still on a scaffold in the shipyard.[14] The fire lasted about five hours, and resulted in immense damage to the submarine; the command center was completely burned out.[15] While some equipment could be rescued, most had to be replaced.[9] This delayed the construction of the submarines once again. The costs of the resulting damage was 225 million guilders, which was fully covered by insurance.[15][16] The exact location, origin and cause of the fire was never established. Presumably, the fire was caused in the vicinity of the corporals and men's washroom by a defect in the electrical work lighting. Repairs were reported as complete in 1987,[8] but had so delayed construction of Walrus that the second submarine (with construction number 349) was put into service as the first of the class, with the name HNLMS Zeeleeuw (sea lion). HNLMS Walrus was put into service two years later. The two other boats were put into service as HNLMS Dolfijn and HNLMS Bruinvis (porpoise). The delays meant that HNLMS Dolfijn (S808), HNLMS Potvis and HNLMS Tonijn of the Dolfijn class had to remain in service longer than planned.[15] All the problems, delays and rising costs were eventually dubbed by the Dutch national parliament as the "Walrus-affair".[14] Nonetheless, at the time of their commissioning, the Walrus-class submarines were considered to be one of the most modern and advanced conventional submarines in operation.[8]

Design

Inside the conning tower
Operations compartment aboard Zeeleeuw, 1998
Torpedo room aboard Zeeleeuw

The Walrus-class submarines are unusual in that instead of a cross-shaped assembly of stern diving planes and rudders, they mount four combined rudders and diving planes in an "X" configuration.[17] This tail configuration was first tested in 1960 on the United States Navy's USS Albacore, and has since been used by the Walrus class, all Swedish Navy submarines since the Sjöormen class, the Royal Australian Navy's Collins class, the German Navy Type 212A and the Japan Maritime Self-Defense Force's Sōryū class. The X configuration is a complex system and therefore not implemented by many other navies around the world.[7]

The submarines of the Walrus class, when submerged, are silent and therefore difficult to detect by ships, planes and other submarines once they go into hiding.[18] This makes the boats very suitable for combating surface vessels and submarines, protecting friendly units, gathering information, providing early warning detection, and supporting special operations. The submarines can also be used to enforce international sanctions, as they did during the Yugoslav Wars.[19]

The Walrus-class submarines were specifically designed for hunting Russian submarines during the Cold War.[20] However, the Cold War had ended by the time they became operational. Nonetheless, they have provided excellent services in various international conflict situations in which the deployment of the Royal Netherlands Navy was requested.[14] Since the Dutch submarines have acquired a good reputation, they are often part of international exercises, taking part in mock battles.[18][21]

In March 2023 it was reported that the Dutch government wants to buy Tomahawks for the Walrus class submarines.[22][23] The Tomahawks would be the Torpedo Tube Launch (TTL) version, which can be fired from the torpedo tubes of the submarines.[24] However, at the same time it was also stated that if the delivery of this version of the Tomahawk would take too long to deliver it might not be feasible to integrate them on the Walrus class, as these submarines will replaced in the 2030s by a new class of submarines.[25]

Operational history

Aerial view of Zeeleeuw

After the Cold War, the submarines have been tasked with many highly confidential intelligence gathering operations, many of which are still classified.[26] They have operated in the Northern Atlantic, Mediterranean Yugoslavian region, the Persian Gulf at Iran and Iraq, and the Caribbean, often upon the request of allies, including the United States.[20]

In June 2010, the Netherlands agreed to deploy one submarine to help combat piracy off the coast of Somalia.[27]

In November 2016, the Russian Navy claimed to have chased off a Walrus-class vessel from a battle group that included the Admiral Kuznetsov.[28]

Submarine command course

Engine room aboard Zeeleeuw

The Walrus-class submarines are used for the Submarine Command Course (SMCC) for both national and international candidates (including the UK, Australia and Canada), selecting and training future commanders of conventional submarines. They are highly rated, with an exceptional reputation.[29] The Royal Netherlands Navy began this course after the British Royal Navy phased out their conventional submarines.

Upgrade program

HNLMS Zeeleeuw being upgraded in 2014

In 2007, the Dutch cabinet approved an upgrade of the four operational submarines and recruitment of additional crew to improve overall operational availability.[30] The upgrades were focused on near-shore operations and integration with new weapons, and include:

  • The migration from the MK 48 mod-4 torpedo to the mod-7 version[31]
  • Replacing one periscope with a non-hull-penetrating optronic mast from L-3 KEO which enables the submarine to capture HD footage, both day and night[32]
  • Addition of a mine and obstacle avoidance sonar by ELAC Nautik
  • Refurbishing of the pressure hull[33]
  • Introduction of a new combat management system[33]
  • Modifications to support special operations forces

In 2013, the contract for the Walrus-class (IP-W) Conservation Program was signed.[34] The program covered the preservation of the pressure skin, the replacement of the sonar, navigation periscope and GIPSY combat system, improved communication systems and adaptations to a number of platform systems.[35] The Dutch industry and knowledge institutes were heavily involved in the program via the Dutch Underwater Knowledge Centre.[36][37][38] It was predicted that the upgrade program would lead to a estimated 400.000 man-hours of work for each boat.[39] All four boats were to be modernized by 2019. With the conservation program, the boats can be kept operational until mid-2025.[40] The cost of upgrading the four submarines was estimated to be 94 million euros.[41] The first boat to be upgraded was Zeeleeuw, followed by Dolfijn, Bruinvis and Walrus.[30][42][43] The upgrade of Zeeleeuw took longer than expected. Initially the upgrade was expected to have been completed by 2015, but it took until 2016 before the submarine was ready for service again. Currently,[when?] Bruinvis is being upgraded at the Den Helder naval base.[44] The Royal Netherlands Navy has also begun to prepare for the replacement of the Walrus-class submarines.[45]

Replacement

In November 2014, the Dutch Minister of Defence announced plans to replace the Walrus-class submarines[46] in 2025. By 2017, there was still no political agreement on the quantity or type of new submarines to be ordered, nor the tasks they were expected to perform. However, it seems certain that they will be replaced, since the alleged Russian threat was regarded an incentive to invest in a new class. The Minister of Defence, however, delayed the replacement by two years, until 2027. Roughly, there are two groups in the Dutch parliament – one in favor of replacing the Walrus class by an equally capable class of large, expeditionary, diesel-electric submarine, and the other in favor of choosing a cheaper solution of smaller diesel-electrics, similar to Swedish and German submarines. It is unknown where the new boats will be built; since the Dutch RDM shipyard (the only Dutch yard capable of building submarines) is no longer in operation. The Defensienota (Defense policy for the coming years) of March 2018 revealed that the Dutch government is still planning to replace the Walrus-class submarines,[47] with an allocated budget of more than 2.5 billion euros for the new submarines. Additional information on how to proceed with the replacement was expected at the end of 2018, when the Dutch Minister of Defence, Ank Bijleveld, was to send a so-called B-letter to the Dutch parliament.[47][needs update] Minister Bijleveld also underlined in an interview that the new submarines should have the same niche capabilities as the current Walrus-class submarines: the ability to operate and gather intelligence in both shallow water close to the coast and in deep water in the ocean.[48] In mid-2021 it was indicated that a revised plan envisaged taking a replacement decision in 2022 and to have the first vessel in service by 2028, with the first two boats to be in service by 2031.[49] However, in October 2021 it was reported that this timeline was no longer feasible. Instead, the Dutch Ministry of Defence signalled that the envisaged dates would have to be "substantially adjusted", possibly incorporating a life extension refit for the existing Walrus-class boats.[50]

In April 2022 it was announced that two of the Walrus-class boats would be extended in service until the mid-2030s and that in order to do so safely a different maintenance approach would have to be adopted for the entire fleet with one of the four existing boats to be decommissioned in the short-term, followed by a second boat later.[51] On 16 November 2022 it was revealed that Walrus would be the first boat to be decommissioned sometime in 2023.[44] Walrus was decommissioned in October 2023.[52] The revised schedule for the construction of the new replacement boats would likely see the first two vessels entering service in the 2034 to 2037 timeframe.[53]

Contenders

The Ministry of Defence shortlisted three bidders:[54][55]

  • Damen Group and Saab Group announced that they had partnered from 2015 to jointly develop, offer and build next-generation submarines that are able to replace the current Walrus-class submarines.[56] It was announced on 1 June 2018 that their design was to be derived from the A26 submarine.[57][58] The proposed submarine is around 73 m (239 ft 6 in) long with a diameter of 8 m (26 ft 3 in). Furthermore, the displacement will be around 2,900 tonnes, with a complement of 34 to 42 personnel. The boat's armament includes 6 torpedo tubes and 1 multi-mission lock which can be used to deploy special forces.[57]
  • Naval Group announced that it was offering its newest submarine class, the Barracuda class, as replacement for the Walrus class. A version of the "Shortfin" diesel-electric variant Barracuda class was to be offered, rather than the nuclear variant used by the French Navy.[59]
  • ThyssenKrupp Marine Systems was planning to offer a Type 212CD submarine.[60]

Spain's Navantia's S-80 was not accepted as a contender following the B-letter in 2019.[61] In 2022 the Spanish Ministry of Defence sent a letter to the Dutch DMO for Navantia to be allowed to put in an offer following the announcement that a RFQ will be sent to the remaining contenders, in which some of the requirements had changed. It was rumoured that the request was denied by DMO.[62]

On 16 November 2022 the RFQ was sent out to the three remaining shipyards. It was expected they would submit their bids around mid-2023.[44][63] In June 2023 it was reported that the three shipyards had to submit their bids by 28 July 2023 at the latest.[64]

Winning bid

On 15 March 2024 State Secretary for Defence Christophe van der Maat officially announced that Naval Group has been selected as the winning bid.[65][66][67] Prior to this announcement, the winner was already leaked to several media outlets, which caused political backlash for choosing a foreign yard over a Dutch one.[68]

The names of the new submarines where also announced by Van der Maat. The class will be known as the Orka class, with the subs named Orka, Zwaardvis, Barracuda and Tijgerhaai. The first two will be delivered within ten years after the contract has been signed.[65][66][67]

Ships in class

All boats were built by RDM.

Walrus class construction data[2][4]
Ship name Hull number Laid down Launched Commissioned Decommissioned Status
Walrus S802 11 October 1979 28 October 1985
13 September 1989 (re-launched)[69]
25 March 1992 12 October 2023[70] Decommissioned and used for spare parts.[71]
Zeeleeuw S803 24 September 1981 20 June 1987 25 April 1990 In service
Dolfijn S808 12 June 1986 25 April 1990 29 January 1993 In service
Bruinvis S810 14 April 1988 25 April 1992 5 July 1994 In upgrade program

See also

References

  1. ^ Jaime Karremann (2013-03-15). "Hoeveel kost de Onderzeedienst?" (in Dutch). marineschepen.nl. Retrieved 2018-03-18.
  2. ^ a b c d Nooteboom (2001), p. 144.
  3. ^ Horneman (2018), pp. 10-12.
  4. ^ a b c van Amstel (1991), p. 59
  5. ^ Nooteboom (2001), p. 182.
  6. ^ a b H. Vredeling, C.L.J. van Lent, A. Stemerdink, p. 61.
  7. ^ a b "Walrus". www.globalsecurity.org. Retrieved 22 June 2018.
  8. ^ a b c d "Onderzeeboten "Walrusklasse"". www.navyinside.nl. Archived from the original on 2018-03-28. Retrieved 27 March 2018.
  9. ^ a b c d "Walrusklasse onderzeeboten". www.marineschepen.nl. 10 November 2016. Retrieved 27 March 2018.
  10. ^ "Bouwnummer RDM-348, Hr. Ms. "Walrus", 1992, onderzeeboot". www.rdm-archief.nl. Retrieved 22 June 2018.
  11. ^ "RSV-debacle viert 30ste verjaardag". www.nos.nl (in Dutch). 19 February 2013. Retrieved 22 June 2018.
  12. ^ "De RSV-enquête". www.anderetijden.nl (in Dutch). 19 February 2012. Retrieved 22 June 2018.
  13. ^ "Kamer stemt in met 'zuivering': Reorganisatie van marinetop". www.leiden.courant.nu (in Dutch). 21 November 1984. Retrieved 22 June 2018.
  14. ^ a b c de Bles, Boven and Homburg (2006), p. 104
  15. ^ a b c "Bouwnummer RDM-353, Hr. Ms. "Bruinvis", 1994, onderzeeboot". www.rdm-archief.nl. Retrieved 16 June 2018.
  16. ^ Horneman (2018), p. 17.
  17. ^ "Walrus-Class Submarines". www.naval-technology.com. Retrieved 2018-06-22.
  18. ^ a b "Onderzeeboten". www.defensie.nl (in Dutch). 2015-11-30. Retrieved 2018-06-22.
  19. ^ "Onderzeeboten". www.sail.nl (in Dutch). Archived from the original on 2018-03-30. Retrieved 2017-12-17.
  20. ^ a b de Bles, Boven and Homburg (2006), pp. 104–105
  21. ^ "The Royal Netherlands Navy in Focus". www.defensie.nl (in Dutch). 2017-04-20. p. 35. Archived from the original on 2018-06-22. Retrieved 2018-06-22.
  22. ^ Jaime Karremann (16 March 2023). "Langeafstandsraketten voor fregatten en onderzeeboten; Tomahawk testlancering in 2024". Marineschepen.nl (in Dutch).
  23. ^ Zijlstra, Martin (11 April 2023). "Onderzeeboot en LCF krijgen 'lange arm'". Alle Hens (in Dutch). Koninklijke Marine.
  24. ^ Tayfun Ozberk (13 April 2023). "Netherlands Selects Tomahawk to Arm Frigate and Submarines". Naval News.
  25. ^ Jaime Karremann (4 April 2023). "In 2027 eerste Nederlandse fregat met Tomahawk". Marineschepen.nl (in Dutch).
  26. ^ Koenen, Sander (September 2009). "Kopje Onder" (PDF). Klaar Voor Onderwater (in Dutch). Vol. 32, no. 109. Den Helder: Onderzeedienst Reünistenvereniging. pp. 3–9.
  27. ^ "Nederlandse Onderzeeboot tegen piraten". 2010-06-22.
  28. ^ "Russia ships 'chase away' Dutch submarine in Mediterranean". BBC. 2016-11-09. Retrieved 10 November 2016.
  29. ^ de Bles, Boven and Homburg (2006), p. 105
  30. ^ a b Twigt, André (10 February 2016). "Terug in de eredivisie". Retrieved 23 November 2017.
  31. ^ André Twigt (30 September 2016). "Opknapbeurt voegt dimensie toe". Materieelgezien (in Dutch). Defensie.nl.
  32. ^ Pieter van Geldere (5 June 2015). "Beter zicht voor de Zeeleeuw". Materieelgezien (in Dutch). Defensie.nl.
  33. ^ a b Kesseler, Andre (December 2012). "Klaar voor het bruine water" (PDF). Klaar Voor Onderwater (in Dutch). Vol. 35, no. 122. Den Helder: Onderzeedienst Reünistenvereniging. pp. 11–16.
  34. ^ "Imtech Marine ontvangt meerjarige opdracht voor modernisering van onderzeeboten" (in Dutch). 23 May 2013. Retrieved 22 June 2018.
  35. ^ Kesseler, André (13 May 2013). "Upgrade Nederlandse onderzeeboten van start" (in Dutch). Retrieved 22 June 2018.
  36. ^ van Kesteren (2020), p. 13.
  37. ^ Horneman (2018), p. 82.
  38. ^ "Verborgen wapen: onderzeeboten vol Nederlandse techniek". VNO-NCW (in Dutch). 15 May 2017.
  39. ^ Booy, Arie (September 2012). "Maatwerk in een bakbeest" (PDF). Klaar Voor Onderwater (in Dutch). Vol. 35, no. 121. Den Helder: Onderzeedienst Reünistenvereniging. pp. 9–10.
  40. ^ Steketee, Menno (December 2011). "Nederlandse onderzeeboten krijgen een nieuwe toekomst" (PDF). Klaar Voor Onderwater (in Dutch). Vol. 34, no. 118. Den Helder: Onderzeedienst Reünistenvereniging. pp. 5–8.
  41. ^ Karremann, Jaime (10 November 2016). "Instandhoudingsprogramma Walrusklasse (IP-W)". Retrieved 24 November 2017.
  42. ^ "Eerste gemodificeerde Walrusklasse onderzeeboot te water, een mooi project van Nevesbu!". December 2015. Archived from the original on 2017-12-01. Retrieved 24 November 2017.
  43. ^ Perreijn, Djenna (2 November 2017). "Mercuur en Zeeleeuw maken nieuwe start". Retrieved 25 November 2017.
  44. ^ a b c "Onderzeeboot Zr.Ms. Walrus in 2023 uit dienst" (in Dutch). Marineschepen.nl. Retrieved 22 November 2022.
  45. ^ Marno de Boer (5 June 2018). "Wie mag de grootste militaire aankoop sinds de JSF gaan bouwen?". www.trouw.nl. Retrieved 5 June 2018.
  46. ^ Tomkins, Richard (22 January 2015). "Swedes, Dutch partner for future submarine work". UPI.com. Retrieved 3 March 2015.
  47. ^ a b "Defensienota 2018" (in Dutch). Dutch Ministry of Defense. 26 March 2018. Retrieved 27 March 2018.
  48. ^ Keultjes, Hanneke; Boere, Raymond (27 March 2018). "We gaan niet oplappen, we gaan vernieuwen" (in Dutch). BNDeStem. Retrieved 27 March 2018.
  49. ^ "Dutch Navy Walrus-class submarine replacement project in progress". June 2021.
  50. ^ "Netherlands' Walrus-Class Submarine Replacement Program Facing Delays". 31 October 2021.
  51. ^ Bode, Jessica; Margés, Joost (13 April 2022). "Langer door met minder boten". Alle Hens (in Dutch). Koninklijke Marine.
  52. ^ Defensie, Ministerie van (12 October 2023). "Zr.Ms. Walrus na 31 operationele jaren uit dienst gesteld - Nieuwsbericht - Defensie.nl". www.defensie.nl (in Dutch).
  53. ^ "Netherlands to extend the life of Walrus class submarines". 3 April 2022.
  54. ^ "The Netherlands: 3 bidders shortlisted for submarine replacement program". Naval Today. 2019-12-16.
  55. ^ Sprenger, Sebastian (2019-12-17). "One bidder out, three remain in Dutch race to replace Walrus subs". Defense News. Sightline Media Group.
  56. ^ "Saab and Damen Team for Walrus Future Submarine Replacement Programme". www.damen.com. 20 January 2015. Retrieved 8 December 2017.
  57. ^ a b "Meer details voorstel nieuwe Nederlandse onderzeeboot van Saab en Damen". www.marineschepen.nl. 5 June 2018. Retrieved 1 June 2018.
  58. ^ Stichting Nederlandse Industrie voor Defensie en Veiligheid magazine editie 2-2018 (June 2018), accessed 12 June 2018, pp. 11-12.
  59. ^ "Franse werf Naval Group wil Nederland dieselelektrische variant van nucleaire onderzeeboot Barracuda aanbieden". www.marineschepen.nl. 1 May 2018. Retrieved 1 May 2018.
  60. ^ Fiorenza, Nicholas (2019-12-16). "Netherlands downselects contenders for submarine replacement". Jane's 360.
  61. ^ "Navantia woest: redenen voor uitschakeling "slaan nergens op"" (in Dutch). Marineschepen.nl. 20 December 2019. Retrieved 22 November 2022.
  62. ^ "Spanje heeft om terugkeer in race Nederlandse onderzeeboten gevraagd" (in Dutch). Marineschepen.nl. 17 October 2022. Retrieved 22 November 2022.
  63. ^ "Netherlands' Submarine Replacement Program: RFQ Sent To 3 Shipbuilders". Naval News. 16 November 2022. Retrieved 22 November 2022.
  64. ^ "Netherlands Ministry of Defence explains award process for new submarines". Navy Recognition. 16 June 2023.
  65. ^ a b "Bouw nieuwe onderzeeboten voorlopig gegund aan Naval" (in Dutch). Dutch Ministry of Defense. 15 March 2024. Retrieved 15 March 2024.
  66. ^ a b "Defensie bevestigt miljardenproject: nieuwe onderzeeërs heten Orka, Zwaardvis, Barracuda en Tijgerhaai" (in Dutch). RTL Nieuws. 15 March 2024. Retrieved 15 March 2024.
  67. ^ a b "The Netherlands Select Naval Group For Its New Submarines". Naval News. 15 March 2024. Retrieved 15 March 2024.
  68. ^ "Kamerdebat onderzeeboten: zorgen en veel aandacht voor Nederlandse industrie, maar geen ingreep" (in Dutch). Marineschepen.nl. 14 March 2024. Retrieved 15 March 2024.
  69. ^ Horneman (2018), p. 18.
  70. ^ Jaime Karremann (2 October 2023). "Walrus volgende week als eerste onderzeeboot uit dienst". Marineschepen.nl (in Dutch).
  71. ^ Rudy Ruitenberg (13 October 2023). "Dutch navy starts retiring submarines, but successor still unknown". Defense News.

Bibliography

  • KVMO, "Nut en noodzaak onderzeeboten: deltaplan voor defensie" Marineblad Maart 2016 nr 2 Jaargang 126.
  • Boeke, S. (2006), Onzichtbaar maar onmisbaar: De onderzeeboot en zijn proliferatie (in Dutch), MILITAIRE SPECTATOR 175, pp. 198–208
  • de Bles, Harry; Boven, Graddy; Homburg, Leon (2006). Onderzeeboten! (in Dutch). Zaltbommel: Aprilis. ISBN 978-90-5994-130-4.
  • Om de veiligheid van het bestaan: defensiebeleid in de jaren 1974-1983, H. Vredeling, C.L.J. van Lent, A. Stemerdink. Defensienota 1974. Kamerstuknummer 12994 ondernummer 14. ISBN 90 12 005361.
  • van Amstel, W.H.E. (1991). De schepen van de Koninklijke Marine vanaf 1945 (in Dutch). Alkmaar: De Alk. ISBN 90-6013-997-6.
  • Nooteboom, S.G. (2001). Deugdelijke schepen: marinescheepsbouw 1945-1995 (in Dutch). Zaltbommel: Europese Bibliotheek. ISBN 90-288-2637-8.
  • Horneman, G.D., ed. (2018). Monografie Nederlandse onderzeeboten (in Dutch). Vol. 4: Operationele boten. Soesterberg: Aspekt. ISBN 978-94-6338-381-3.
  • van Kesteren, E.E., ed. (December 2020). "De Aanloop Naar IPW". Klaar voor Onderwater: Vereniging voor aktief en oud onderzeedienstpersoneel (in Dutch). Vol. 43, no. 154. Julianadorp: Onderzeedienst Reünistenvereniging. pp. 13–20. ISSN 2214-6202.

Further reading

  • Jalhay, P.C.; Wijn, J.J.A. (1997). Ik nader ongezien! De onderzeeboten van de Koninklijke Marine. Amsterdam: De Bataafsche Leeuw. ISBN 978-9067074629.