Synex InternationalSynex International Inc. (TSX: SXI) is a Vancouver, Canada, based company that has traded on the Toronto Stock Exchange since 1987. It is made up of two wholly owned subsidiary companies: Synex Energy Resources Ltd. (the Energy Division) and Sigma Engineering Ltd. (the Engineering Division). Operational projectsMears creek (4MW, 20GWh/yr) Cypress creek (3MW) Barr creek hydro (4MW, 15GWh/yr) This project was awarded a Power Purchase Agreement in BC Hydro's 2006 Open Call for Power and later qualified for the $10/MWh ecoENERGY grant. Construction began on the access roads to the project site in May 2010 and the project is expected to be operational in November 2011.[4] In October 2010, Synex announced that it owns 90% of Barr Creek LP and the remaining 10% is owned by the Ehattshat First Nation, which has the option to purchase an additional 10% from Synex before Jan 2011. [5] Development projectsMcKelvie creek hydro (3.4MW, 14GWh/yr) Originally, the McKelvie Creek project was awarded a PPA in the 2006 Open Call for Power. Development was stalled in July 2007, as due higher than anticipated costs required for interconnection with the grid pushed capital costs up from $10m to $15m.[6] Synex later revealed that it was expecting to receive a new PPA for this project via BC Hydro’s Standing Offer Program. However, BC Hydro has barred projects that received PPAs in the 2006 and 2008 Call processes from participating in the Standing Offer Program. Victoria lake hydro (9.5MW, 39GWh/yr) This was one of three PPAs awarded to Synex in the 2006 Open Call for Power (the firm bid four projects in total).[7] Located near Port Alice, this project has an estimated capital cost of $18m. In its Q3 2009 report, Synex stated that regulatory work was progressing on this project. However, the firm has not mentioned any further developments since that time. See also
References and footnotes
|