Construction of the station began in May 2015, with the first pile poured on June 17, 2015, and the last section of the platform layer poured on October 15, 2016.[3]
Gallery
Concourse
Platform
Exit A
References
^齐中熙 (2020-11-30). "广清城际、广州东环城际铁路开通运营" [Guangzhou-Qingyuan Intercity Railway and Guangzhou East Ring Intercity Railway opened for operation]. Xinhua News Agency (in Simplified Chinese). Archived from the original on 2022-05-07. Retrieved 2024-08-05.
^"广清城际铁路工务工程静态验收专业审查顺利完成" [The static acceptance professional review of the Guangzhou-Qingyuan intercity railway engineering project was successfully completed] (in Simplified Chinese). 2020-07-06. Retrieved 2024-08-05.
^舒仕雄 (2018-11-28). "【重磅】广清城际狮岭、石陂站点开始装修,距离开通更近了!" [[Breaking News] The renovation of Shiling and Shipi stations of Guangqing Intercity Railway has begun, and the opening is getting closer!]. Guangzhou Huadu release (in Simplified Chinese). Archived from the original on 2024-02-12. Retrieved 2024-08-05 – via Southern Network.
Stations that are proposed, under planning or under construction are shown in italics. English names of these stations are not yet confirmed. Stations that have suspended operations are shown in gray.