Shanghai Metro station
Shangda Road (Chinese: 上大路; pinyin: Shàngdà Lù), previously named Hutai Road,[1] is a metro station on Line 7 of the Shanghai Metro in Baoshan District, Shanghai. It began operation on December 5, 2009.[1]
The station has 3 platforms, but only the outer island platform and the side platform are in regular service.
Nearby
Exits
There are 4 exits/entrance to the station, all located on different sides of Shangda Road.[2]
|
---|
|
Line 7 | |
---|
Stations in italics have yet to open. |
References