Nyamagasani II Hydroelectric Power Station
Nyamagasani II Hydroelectric Power Station, also 'Nyamagasani 2 Hydroelectric Power Station, is a 5 megawatts (6,700 hp) mini hydro power station, under construction in the Western Region of Uganda.[1] LocationThe power station is located near the village of Kyarumba, in Kaghema parish, Kyarumba sub-county, in Kasese District, in the foothills of the Rwenzori Mountains.[1] This about 45.5 kilometres (28 mi), by road, southwest of Kasese, the nearest large town and the location of the district headquarters.[2] Nyamagasani II Power Station lies close to and immediately downstream of its sister station Nyamagasani I Hydroelectric Power Station, which is under simultaneously development, by the same developers.[1] Nyamagasani 2 is located at an altitude of about 1,392 metres (4,567 ft).[3] OverviewNyamagasani II HEPS is a run-of-river mini-hydro power plant, whose planned installed capacity is 5 MW.[1] The project company, Nyamagasani 2 HPP Limited, is majority-owned by DI Frontier Market Energy & Carbon Fund, a Denmark-based renewable energy investment company.[4] TimelineThe project received GetFit approval in June 2015, and financial close was achieved in 2016. Construction started in 2017. Completion was initially expected in the fourth quarter of 2018.[1] As of June 2019, completion and commissioning were expected during the second half of 2019.[5] FundingConstruction is budgeted to cost US$19.8 million, with US$3.7 million in GetFit subsidies. The funding includes money to build new 33 kV high-voltage lines to evacuate the power generated to Nkenda sub-station,[1] approximately 36 kilometres (22 mi), to the northeast of Kyarumba, as the crow flies.[6] This includes power generated from the adjacent Nyamagasi 1 Power station.[1] See alsoReferences
External links |