Mudan Dam
The Mudan Dam (traditional Chinese: 牡丹水壩; simplified Chinese: 牡丹水坝; pinyin: Mǔdān Shuǐbà) is a dam in Mudan Township, Pingtung County, Taiwan. It forms the largest reservoir in Pingtung County. HistoryThe construction of the dam began in 1989 and was completed in 1995.[1] In early November 2020, the dam released its water in preparation for the upcoming Typhoon Atsani.[2] Technical detailsThe reservoir collects water from Rureng Creek and Mudan Creek. The surface area of its catchment is 60 km2 with a total effective storage capacity of 27,930,000 m3.[3] It supplies water for domestic and agriculture water demands in Checheng, Fangliao, Fangshan, Hengchun, Manzhou and Mudan Townships, as well as public water around Kenting National Park. See alsoReferences
Wikimedia Commons has media related to Mudan Dam.
|