There are many architectural projects under construction in Belgrade, Serbia. Since 2002, Belgrade has experienced a major construction boom. These are only some of the projects under construction in Belgrade:[1]
Airport City Belgrade Under construction is one 14-story building with underground garages. Three new buildings including one Crowne Plaza hotel will start in 2020. Airport Garden residential buildings started in 2019.
Wellport Belgrade Condominium project started in 2018. Estimated cost is 130 million Euros.[2]
Big Residences Total investment of 200 million euros under construction next to the Big shopping mall. Almost 1100 apartments will be constructed with 2200 parking spots. First phase of shopping area is opened in December 2019.[5]
IKEA Retail Center Additional Center next to the IKEA Istok. Will have 40.000 sq.m and will cost 70 million Euros.
Transportation, medical and infrastructural projects
Belgrade Metro Two lines of total 42 km under construction. First line will be open in 2028, second in 2030. Total cost 9bn Euros.
Belgrade bypass New Orlovaca, Batajnica interchange and connection to Bubanj Potok bypass with new interchange is under construction.
Belgrade Centre railway station a mega-project that's scheduled to begin in September 2020, resulting in relocation of the main railway station and its railway tracks, which will consequently free up building space in Belgrade's inner centre. The entire project is worth an estimated 2 billion US dollars, and is scheduled to be completed within a decade. The Serbian company Energoproject will invest €200 million. Already invested over a billion dollars.
Cleaning Sewer Water Plant Veliko Selo with additional interceptor. Power Construction Corporation of China is contractor. Investment 385 million euros in Phase 1. Started in 2018.
Merin Tower Mixed use tower will be next to the NCR Campus in Block 42. It will have 28th floors and 100m height.
Alta Tower 28 floor residential tower in New Belgrade.
Delta Center Block 20 Twin towers of 100m height in Block 20 New Belgrade. One tower will be Hotel Intercontinental. Planned in 2021.
Kempinski Hotel (reconstruction of Hotel Jugoslavija): in New Belgrade on the banks of the Danube. Expansion will add two twin 144 m tall 33-story skyscrapers. Casino Austria already invested about €60 million.
Novak Tennis Center will be built in New Belgrade's in Blok 45. The complex will consist of 20–30 smaller tennis courts, and one main court with 5000 seats. The center will also have a tennis academy, a hotel, a hostel and other facilities. One of the owners will be ace Novak Djokovic, after whom it is named.
IKEA Zapad Another IKEA store will be located close to the airport.
Ada Huja Bridge New bridge across river Danube. Construction starts in 2020 and worth it 120 million Euros.
National Stadium will be constructed in Municipality of Surcin. It will have 65.000 seats and it will cost around 250 million Euros.
Recently finished projects
GTC X New office building pin New Belgrade. Opened in 2022.
NCR Corporation Campus will employ 5.000 employees and cost 90 million dollars. Opened in 2022.
Chinese Cultural Center Belgrade Chinese Cultural Center will be one of the biggest in the world with a total of 32.000 sq meters. It will be located where the bombed Chinese Embassy in 1999 stood. When done, will be the largest Chinese Cultural Center in Europe. Total investment 45 million Euros. Opened in 2022.[7][8][9]
West 65 Project of 152.000 sq m and a 40-storey tower (155 m) in New Belgrade. Tallest residential skyscraper in Belgrade opened in 2022.
Dedinje 2 New Cardic Surgery hospital next to Dedinje 1 Hospital. Opened in 2021.
Batajnica Hospital is new 18.000 sqm hospital in Batajnica suburb. Construction done in just four months. Opened in 12/2020.[10]