Line 5 (Nanning Metro)
Line 5 of the Nanning Metro is a rapid transit line in Nanning which opened on 16 December 2021. The line is 20.2 km long with 17 stations and uses driverless 6-car Type B trains.[1][2][3] Opening timeline
Stations
References
|