Line 4 (Changsha Metro)

Line 4
Line 4 train ariving Guangda Station
Overview
StatusOperational
OwnerChangsha Government
LocaleChangsha, Hunan, China
Termini
Stations25
Service
TypeRapid transit
SystemChangsha Metro
Services1
Operator(s)Changsha Metro Corporation
Rolling stock6-car Type B
History
Opened26 May 2019; 5 years ago (2019-05-26)[1]
Technical
Line length33.5 km (20.82 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)

Line 4 of the Changsha Metro (Chinese: 长沙地铁四号线; pinyin: Chǎngshā Dìtiě Sì Hào Xiàn) is a rapid transit line in Changsha. It began trial operations without passengers on 29 December 2018.[2] The line opened on 26 May 2019 with 25 stations.[1]

Opening timeline

Segment Commencement Length Station(s) Name
Guanziling — Dujiaping 26 May 2019[1] 33.5 km (20.82 mi) 25 Phase 1

Stations (Phase 1)

Station name[1] Connections Distance
km
Location
English Chinese
Guanziling 罐子岭
West Yueliangdao 月亮岛西
Xiangjiang New Town 湘江新城
Hanwangling Park 汉王陵公园
West Fuyuan Bridge 福元大桥西
Chazishan 茶子山
Guanshaling 观沙岭  CZT 
Liugoulong 六沟垅  6 
Wangyuehu 望月湖
Yingwanzhen 溁湾镇  2 
Hunan Normal University 湖南师大
Hunan University 湖南大学
Fubuhe 阜埠河  3 
Bishahu 碧沙湖
Huangtuling 黄土岭  1 
Shazitang 砂子塘
Chigangling 赤岗岭
Shumuling 树木岭  CZT 
Guitang 圭塘  5 
Shawan Park 沙湾公园  2 
Sutang 粟塘
Pingyang 平阳
South Railway Station 长沙火车南站  2   Maglev  Changsha South railway station CWQ
Guangda 光达  2 
Dujiaping 杜家坪

References

  1. ^ a b c d "长沙地铁4号线周日"迎客" 赶快带上这份乘车指南来"尝鲜"". 2019-05-25. Archived from the original on May 26, 2019.
  2. ^ "7项首创新技术!4号线今起空载试运行". 2018-12-29.