Line 2 (Coimbatore Metro)

Green Line
Overview
StatusProposed
Termini
Stations14
Service
TypeRapid transit
SystemCoimbatore Metro
Technical
Number of tracks2
Character14.4 km Elevated
Operating speed80 km/h (50 mph)
Route map

Valiyampalayam Pirivu
VGP Nagar
Viswasapuram
Saravanampatti
Chitra Nagar
Vinayagapuram
Ramakrishna Mills
Athipalayam
Ganapathy Pudur
Moor Market
Coimbatore Omni Bus Stand Bus interchange
Gandhipuram Bus Terminus Bus interchange
Ramnagar
Coimbatore Junction Mainline rail interchange

The GreenLine or Line 2 is one of the two proposed lines of Coimbatore Metro, Phase 1 Project, the second being the Red line (Line 1). The line stretches from Coimbatore Junction to Valiyampalayam Pirivu. The line consists of 14 stations.[1][2]

Stations

The stations proposed in the first phase of Coimbatore Metro in the Line-2 are:[3]

Green Line
S.No Station Name Interchange connection Places Connected Layout Opened Depot Connection Depot Layout
English Tamil
1 Coimbatore Junction கோயம்புத்தூர் சந்திப்பு   Red Line, Mainline rail interchange Coimbatore Junction railway station Coimbatore Government Hospital Elevated Proposed Phase 1 None None
2 Ramnagar ராம்நகர் None None Elevated Proposed Phase 1 None None
3 Gandhipuram Central Bus Terminus காந்திபுரம் மத்திய பேருந்து நிலையம் Bus interchange Gandhipuram Central Bus Terminus, Bus interchange Gandhipuram Town Bus stand None Elevated Proposed Phase 1 None None
4 Coimbatore Omni Bus Stand கோயம்புத்தூர் ஆம்னி பேருந்து நிலையம் Bus interchange Coimbatore Omni Bus Terminus None Elevated Proposed Phase 1 None None
5 Moor Market மூர் மார்க்கெட் None None Elevated Proposed Phase 1 None None
6 Ganapathy Pudur கணபதி புதூர் None None Elevated Proposed Phase 1 None None
7 Athipalayam அத்திபாளையம் None None Elevated Proposed Phase 1 None None
8 Ramakrishna Mills ராமகிருஷ்ணா மில்ஸ் None Prozone Mall Elevated Proposed Phase 1 None None
9 Vinayagapuram விநாயகபுரம் None None Elevated Proposed Phase 1 None None
10 Chithra Nagar சித்ரா நகர் None None Elevated Proposed Phase 1 None None
11 Saravanampatti சரவணம்பட்டி None None Elevated Proposed Phase 1 None None
12 Viswasapuram விஸ்வாசபுரம் None None Elevated Proposed Phase 1 None None
13 VGP Nagar விஜிபி நகர் None None Elevated Proposed Phase 1 None None
14 Valiyampalayam Pirivu வலியம்பாளையம் பிரிவு None None Elevated Proposed Phase 1 None None

See also

References

  1. ^ "DPR for Coimbatore metro rail project to be submitted to Tamil Nadu government by July 15". The Hindu. 1 July 2023. Retrieved 1 July 2023.
  2. ^ "CMRL Submits Detailed Project Reports for Madurai and Coimbatore Metro Projects". The Metro Rail News. 15 July 2023. Retrieved 15 July 2023.
  3. ^ "39km Metro Line project in Phase 1". India Herald. 7 July 2023. Retrieved 7 July 2023.