Metro line in Tianjin, China
Line 11 Status Operational Locale Tianjin , China Termini Stations 21 (in operation) 24 (when complete) Type Rapid transit System Tianjin Metro Operator(s) CCCC consortiumOpened 28 December 2023; 12 months ago (2023-12-28 ) [ 1] Line length 23.8 km (14.8 mi)[ 2] (Phase 1, excluding 3-station extension) Track gauge 1,435 mm (4 ft 8+ 1 ⁄2 in )Operating speed 80 km/h (50 mph) Highest elevation DC 1500 V with overhead catenary
Line 11 of Tianjin Metro (Chinese : 天津地铁11号线 ; pinyin : Tiānjīn Dìtiě Shí Yī Hào Xiàn ) is a metro line in Tianjin . The east section of Phase 1 (Dongjiangdao–Dongliliujinglu) started operation on 28 December 2023.[ 1]
Opening timeline
Segment
Commencement
Length
Station(s)
Name
Dongjiangdao — Dongliliujinglu
28 December 2023[ 3]
13.68 km (8.50 mi)[ 4]
11
East section of Phase 1
Shuishanggongyuanxilu — Dongjiangdao
28 December 2024[ 5]
10.12 km (6.29 mi)[ 6]
10
West section of Phase 1
Stations
OSI: out-of-system interchange
References
Tianjin Metro
Lines in operation Under construction Under planning
CR S-train
CR C-train
Lines in operation Under construction
Other CR railways
Trams
Planned
Xiqing SkyShuttle T2
Wuqing SkyShuttle 1
Baodi Tram 1
Eco-city Lower-traffic rail transit
Closed
Transportation hubs
Airports Railway stations