The station opened on October 15, 1925 when the line between Tenjinbashi (present-day Tenjimbashisuji Rokuchōme) and Awaji opened.[2]
Future plans
Construction is underway for grade separation. Work is being done as of 2019 to elevate a 3.8 km (2.4 mi) section of the Senri Line between this station and Shimo-Shinjō Station.[3] Originally planned to be opened by 2020, various delays have resulted in the opening being pushed to 2031.[4]
Surroundings
Kunijima Purification Plant (Osaka City Waterworks Bureau)
^Hankyu Corporation (April 2001). 阪急ステーション [Hankyu Stations] (in Japanese). Osaka: Hankyu Corporation. p. 116. ISBN4-89485-051-6.
^"阪急電鉄京都線・千里線(淡路駅付近)連続立体交差事業" [Hankyu Railway Kyoto Line / Senri Line (near Awaji Station) continuous grade crossing project]. Osaka City Online (in Japanese). 28 June 2019. Archived from the original on 30 March 2022. Retrieved 29 May 2022.
^"阪急立体交差事業で690億円増 大阪市試算" [69 billion yen increase in Hankyu grade crossing project]. Sankei Shimbun (in Japanese). 10 March 2022. Archived from the original on 8 April 2022. Retrieved 15 September 2022.