You can help expand this article with text translated from the corresponding article in Hebrew. Click [show] for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Hebrew Wikipedia article at [[:he:כביש 71]]; see its history for attribution.
You may also add the template {{Translated|he|כביש 71}} to the talk page.
The portion of the highway between the Navot interchange and Yissachar junction is a four-lane limited-access road, with the rest of the highway consisting of two lanes. In 2020, the National Roads Authority (Netivei Yisrael) published a design-build contract to upgrade the remainder of the highway from Yissachar to Beit She'an to a four-lane limited access road and conversion most of the main intersections to interchanges. This busy section serves local and inter-city traffic to Beit She'an, including frequent freight traffic to and from the border crossing with Jordan.