Haichong Lu station

Haichong Lu

海涌路
Guangzhou Metro
Platform
Chinese name
Chinese海涌路站
Transcriptions
Standard Mandarin
Hanyu PinyinHǎichōnglù Zhàn
Yue: Cantonese
Yale RomanizationHói Chūng Lǒu
JyutpingHoi2chung1lou6 Zaam6
General information
LocationIntersection of Yayun Boulevard (亚运大道) and Haichong Road (海涌路), Shiqi
Panyu District, Guangzhou, Guangdong
China
Operated byGuangzhou Metro Co. Ltd.
Line(s)     Line 3
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code301-3
History
Opened1 November 2024; 58 days ago (2024-11-01)
Services
Preceding station Guangzhou Metro Following station
Haibang
Terminus
Line 3 Shiqinan
towards Airport North (Terminal 2) or Tianhe Coach Terminal

Haichong Lu Station (Chinese: 海涌路站; Cantonese Yale: Hóichūnglǒu Zaahm) is a station of Line 3 of the Guangzhou Metro. It started operations on November 1, 2024, along with the rest of the eastern extension of Line 3.[1] It is located at the underground of the junction of Yayun Boulevard[2] and Haichong Road,[3] in Shiqi, Panyu District, Guangzhou.[4]

History

The station first appeared in the 2003 plan of Guangzhou Urban Rail Transit Plan, when Line 3 planned to travel from Panyu Square to the east to Guangzhou New Town in the direction of Nansha and build a station near Haichong Road intersection with Yayun (Asian Games) Boulevard on the way. The station was originally planned to be named Qianfengcun, but was later renamed to Jinguang Dadao. Subsequently, as part of the East Extension of Line 3, the station was approved by the National Development and Reform Commission in late March 2017 and plans were approved in early January 2018.[5]

The construction of this station started on April 29, 2020,[6] the construction of the enclosure structure was completed on September 27 of the same year,[7] and the main structure was capped in June 2021.[8] In June 2023, Guangzhou Metro Group proposed to name the station Haichong Lu (Road),[9] which was officially approved in October of the same year.[10] On May 31, 2024, the station completed the transfer of the "three powers".[11] On November 1, 2024, the eastern extension of Line 3 was put into operation, along with the station.[1]

Station Layout

G Street level Exits A & B
L1
Concourse
Lobby Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities
L2
Platforms
Platform 1 arrow for L  3  towards Haibang (terminus)
Island platform, doors will open on the left
Platform 2  3  towards Tianhe Coach Terminal or Airport North (Shiqinan) arrow for R

Exits

Exit letter Gallery Exit location Nearby destinations
A Yayun Boulevard Haichong Road, Haichong Lu metro station (Haibangcun) bus stop
B Yayun Boulevard Haichong Road

References

  1. ^ a b 李佳文 (2024-10-30). "广州地铁三号线东延段11月1日开通" [Guangzhou Metro Line 3 East Extension to open on November 1]. Xin Kuai Bao (in Simplified Chinese). Retrieved 2024-11-03.
  2. ^ simplified Chinese: 亚运大道; traditional Chinese: 亞運大道; pinyin: Yàyùn Dàdào; Jyutping: Yai1wun3 Daai6dou6; Cantonese Yale: Yāiwǔn Daaihdouh
  3. ^ Chinese: 海涌路; pinyin: Hǎichōng Lù; Jyutping: Hoi2chung1lou6 Zaam6
  4. ^ "广州地铁三号线东延段正式"开门迎客"!". 2024-11-01.
  5. ^ 李天研 (2018-01-22). "地铁十号线拿到开工纸 将并三号线5个站对角线穿市区" [Metro Line 10 received the construction permit and will merge with Line 3 to run diagonally through the city]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2023-07-15. Retrieved 2024-11-03 – via Sina Corporation.
  6. ^ "一文回顾三号线东延段建设大事记" [An article reviews the major events in the construction of the East Extension of Line 3]. Guangzhou Metro Construction Management (in Simplified Chinese). 2024-11-01. Archived from the original on 2024-11-01. Retrieved 2024-11-03 – via Official WeChat Account.
  7. ^ 李天研 (2020-10-03). "三万地铁建设者长假坚守岗位,两条新线取得重大进展" [Thirty thousand subway builders stayed at their posts during the long holiday, and two new lines made significant progress]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2020-10-06. Retrieved 2024-11-03.
  8. ^ "直击新线|进展出炉,金光大道站成功封顶啦~" [New line progress revealed, Jinguang Boulevard Station has been successfully capped~]. Guangzhou Metro (in Simplified Chinese). 2021-06-15. Archived from the original on 2023-07-15. Retrieved 2024-11-03 – via Southern Network.
  9. ^ 李佳文 (2023-06-25). "地铁三号线东延段、十一号线车站名称邀您提建议" [Please give us your suggestions on the names of the stations on Metro Line 3 East Extension and Line 11]. Xin Kuai Bao (in Simplified Chinese). Archived from the original on 2023-06-25. Retrieved 2024-11-03.
  10. ^ 李天研 (2023-11-01). "有望明年开通!地铁3号线东延段站名获批,11号线还要等等" [It is expected to open next year! The station name of the eastern extension of Metro Line 3 has been approved, and Line 11 will have to wait]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2024-06-05. Retrieved 2024-11-03.
  11. ^ 郑慧梓 (2024-06-04). "土建进度99%!广州地铁三号线东延段进入运营调试阶段" [Civil construction progress is 99%! The eastern extension of Guangzhou Metro Line 3 has entered the operation and commissioning stage]. Nanfang Daily (in Simplified Chinese). Archived from the original on 2024-06-04. Retrieved 2024-11-03.