Berrechid–Beni Mellal expressway
The Berrechid–Beni Mellal expressway (A4) was inaugurated in 2015. It runs mainly parallel with the existing Route Nationale 12. HistoryStart of buildingOn 12 April 2010 King Mohammed VI of Morocco formally started the building-activities for this 173 km (107 mi) long toll-road. Between this date and the opening in 2015, some 35 billion cubic metres (1,200×10 9 cu ft) of soil/ground were moved.[1][2] FinancingThe total building costs are budgeted on 6.050 million Dirham and these investments are made via:
FADES: The Arab Fund for Social and Economical Development, This investment is part of the main-project plan 2008–2015 between the ADM and the government of Morocco. This masterplan was signed on 8 July 2008 during a formal meeting which was attended by King Mohammed VI of Morocco. ConstructionThe first section between Berrechid and Ben Ahmed (38.6 kilometres (24.0 mi)) was built by China International Water & Electric Corporation (CWE). The second section, between Ben Ahmed and Khouribga (38.5 kilometres (23.9 mi)), and the third section between Khouribga and Oued Zem (33 kilometres (21 mi)), were built by four local Moroccan contractors: Sintram, LRN, Seprob and the SNCE. The fourth one between Oued Zem and Kasba Tadla (40 kilometres (25 mi)) was built by a Moroccan contractor, Houar. The fifth and last one, between Kasba Tadla and Beni Mellal ( 22 kilometres (14 mi)) was by another Chinese contractor, Covec. PurposeThis expressway aims to support the development of Béni Mellal-Khénifra region and to reduce road traffic on the National road 11. This expressway links Beni Mellal, capital of Béni Mellal-Khénifra region, to Casablanca, the economic capital and the largest city in Morocco, serving the province of Khouribga, an area of great industrial potential thanks to large phosphate reserves. The Béni Mellal-Khénifra region's agricultural and tourism sectors are also expected to benefit from this expressway. With traffic estimated at 3,700 vehicles per day (2018), the expressway serves the cities of Ben Ahmed, Khouribga, Oued Zem, Bejaad and Kasba Tadla. It includes 7 junction and 3 bridges across the Oum Errabiaa, Oued Derna and Oued Oum Errabia Bouqroum rivers as well as 28 underground and aerial passages. RouteThe total length of the new expressway from Berrechid to Beni Mellal is 174 km (108 mi).
References
|