The wind farm consists of three fields operated by different companies. A total of 91 wind turbines have an installed output power of 150 MW and generate about 375 GWh a year.[1]
Technical details
Field 1 consists of 38 turbines of type Vestas V90/3000 each with 90 m (300 ft) rotor diameter at a hub height of 80 m (260 ft) generating 3.0 MW power. Total installed power increased from 90 MW to 114 MW with the expansion completed in November 2011.[2][3] Operated by Borasco.[1]
Field 2 has a total installed power is 30.0 MW. Operated by Yapısan company.
Field 3 consists of 20 turbines of type Vestas. Total installed power is 30.0 MW. The field is operated by Bares company.